ARTICLE XVI FIREARMS, LIQUOR, AND BEHAVIOR
µÚÊ®ÁùÌõ¿î-ǹ֧ÎäÆ÷,Òû¾Æ¼°ÐÐΪ±íÏÖ
Clause 16.1 Firearmsǹ֧ÎäÆ÷
The possession of firearms and other weapons in the Area of Operations or on facilities operated by or occupied by COMPANY is forbidden.
ÔÚÊ©¹¤ÇøÓò»ò¹«Ë¾¾Óª»òÓµÓеÄÉèÊ©ÄÚ²»ÔÊÐí´æÓÐǹ֧»òÆäËûÎäÆ÷¡£
Clause 16.2 – Intoxicating Liquors or Controlled Substances¾ÆÀà»òÎ¥½ûÎïÆ·
Consuming, storing, dispensing, or otherwise making available intoxicating liquors or controlled substances to anyone in the Area of Operations or on facilities operated by or occupied by COMPANY is forbidden.
ÔÚÊ©¹¤ÇøÓò»ò¹«Ë¾¾Óª»òÓµÓеÄÉèÊ©ÄÚ²»ÔÊÐíÒû¾Æ¡¢²Ø¾Æ¡¢·Ö·¢»òÈÃËûÈ˽Ӵ¥µ½¾ßÓÐÂé×í×÷ÓõľÆÀà»òÎ¥½ûµÄÎïÆ·¡£
Clause 16.3 Misconduct²»Á¼ÐÐΪ
No one shall by his misconduct cause a breach of peace or public disturbance or otherwise deport himself in a manner detrimental to the best interests of COMPANY or Egypt.
ÈκÎÈ˲»µÃÓÉÓÚÆä²»Á¼ÐÐÎªÆÆ»µ°²¶¨¡¢Ôì³É¹«ÖÚɧÂÒ£¬»òʹ×Ô¼ºµÄÐÐΪ¾ÙÖ¹Óк¦ÓÚ¹«Ë¾»ò°£¼°µÄ×î¸ßÀûÒæ¡£.
Clause 16.4 Commissions, Rebates, etc-Ó¶½ð, »Ø¿Û¼°ÆäËû
CONTRACTOR shall not pay any commissions, fees, or grant any rebates to any employee or officer of COMPANY or CONTRACTOR’S sub-contractor nor favor employees or officers of COMPANY with gifts or entertainment of significant cost or value nor enter into any business arrangements with employees or officers of COMPANY (other than with authorized representatives of COMPANY) without COMPANY’S written approval. If CONTRACTOR fails to observe the provisions of this Clause 16.4, COMPANY shall have the right to terminate this Contract.
ûÓй«Ë¾µÄÊéÃæÍ¬Ò⣬³Ð°üÉ̲»µÃÖ§¸¶¸ø¹«Ë¾»ò³Ð°üÉÌ·Ö°üÉ̵ĹÍÔ±»ò¹ÜÀíÈËÔ±ÈκÎÓµ½ð¡¢·þÎñ·Ñ¡¢»ò¸øÓèÈκλؿۣ¬Ò²²»ÄÜÔùË͹«Ë¾¹ÍÔ±»ò¹ÜÀíÈËÔ±¼ÛÖµ½Ï´óµÄÀñÎï»ò¸øÓ軨·Ñ½Ï´ó¿î´ý£¬Ò²²»ÄÜÓ빫˾¹ÍÔ±»ò¹ÜÀíÈËÔ±½øÐÐÉÌÒµ½»Ò×£¨¹«Ë¾ÊÚȨµÄ´ú±í³ýÍ⣩¡£Èç¹û³Ð°üÉÌÎ¥·´ÁË16.4Ìõ¿î£¬“,¹«Ë¾”ÓÐȨÖÕÖ¹±¾ºÏͬ¡£
ARTICLE XVII MISCELLANEOUSµÚÊ®ÆßÌõ¿îÆäËü¹æ¶¨
Clause 17.1 Captions.±êÌâ
The captions and heading used in this Contract are for convenience only and shall not be used to interpret the provisions hereof.
±¾ºÏͬÖеıêÌâºÍÌâÄ¿½öΪ·½±ãÖ®Ó㬲»ÄÜÓÃÓÚ½âÊͺÏͬÌõ¿î¡£
Clause 17.2 Conflicts.Ïàã£
In the event there is a conflict between the provisions of this Contract and the Appendices attached hereto, the provisions of the main body of this Contract shall supersede and govern.
Èç¹û±¾ºÏͬÌõ¿îºÍÆä¸½¼þÓгåÍ»£¬ÒÔ±¾ºÏͬÕýÎÄÌõ¿îΪ׼¡£
Clause 17.3 Modifications1-±ä¸ü
This Contract shall not be changed or modified except in writing signed by the authorized representatives of the parties hereto.
ûÓÐË«·½ÊÚȨ´ú±íµÄÊéÃæÇ©×Ö£¬±¾ºÏͬ½«²»Äܱä¸ü»òÐ޸ġ£
Clause 17.4 Entirety of Contract-ÕûÌåºÏͬ
This Contract constitutes the entire agreement between the parties and supersedes and replaces all prior documents or letters concerning the matters expressed herein.
±¾ºÏͬ¹¹³ÉÁËË«·½ÍêÕûµÄÐÒ飬´úÌæ¡¢È¡´úÁËÒÔǰËùÓйØÓÚ±¾ºÏͬÖ÷ÌâµÄÎļþ»òÐź¯¡£
Clause 17.5 Oral Promises¿ÚÍ·Ðíŵ
There are no oral promises, representations, or warranties affecting this Contract.
ÈκοÚÍ·Ðíŵ¡¢ÉùÃ÷»ò±£Ö¤¶¼²»Ó°Ïì±¾ºÏͬ¡£
Clause 17.6 WaiversÆúȨ
The waiver on the part of any party to this Contract of one or more of its rights hereunder shall be deemed or construed as a continuing waiver on the part of such party so as to prohibit such party from demanding the full performance of the other party's obligations and the enforcement of all such party's rights in accordance with the provisions of this Contract.
¸ù¾ÝºÏͬ¹æ¶¨£¬¾ÍºÏͬµÄÈκÎÒ»·½À´Ëµ£¬·ÅÆúºÏͬÖеÄÒ»Ïî»ò¶àÏîȨÀû½«±»ÈÏΪ»òÀí½âΪ¸Ã·½Ò»Ö±·ÅÆúÕâЩȨÀû£¬ÒÔ·ÀÖ¹¸Ã·½ÒªÇóÐÐʹÆäËùÓеÄȨÀû£¬ÒªÇóÁíÒ»·½ÍêÈ«ÂÄÐкÏͬÒåÎñ¡£
Clause 17.7 Contract LanguageºÏͬÓïÑÔ
The English language shall be used throughout in all communications, notices, reports, correspondence and invoices submitted to COMPANY.
ËùÓеÄͨѶ¡¢Í¨Öª¡¢±¨¸æ¡¢º¯¼þ¼°Ìá½»¸ø¹«Ë¾µÄ·¢Æ±¶¼ÒÔÓ¢ÓïÊéд¡£
IN WITNESS WHEREOF, the Parties hereto have executed this Contract on the day, month, and year first written above.
±¾ºÏͬ˫·½´ú±íÓÚÉÏÊöÈÕÆÚÇ©×ÖÉúЧ£¬ÌØ´ËΪ֤¡£
Alamein Petroleum Company Cairo Drilling Company
°¢ÀÂüʯÓ͹«Ë¾ ¿ªÂÞ×ê¾®¹«Ë¾
General Manager Operation General Manager
×ܾÀí ×ܾÀí
¸½¼þÒ»£º¹¤×÷ÈËÔ±µÄÈÕ³£¹ÜÀí
1 Required licenses, permits, and clearances to enter upon Work Location, including relevant environmental and communications permits.
½øÈëÊ©¹¤ÏÖ³¡ËùÒªÇóµÄÖ´ÕÕ£¬Ðí¿ÉÖ¤¼°³öÈëÖ¤£¬°üÀ¨Ïà¹ØµÄ»·±£ºÍͨѶÐí¿ÉÖ¤¡£
2 Drilling Unit positioning services, if required.ÈçÓÐÒªÇó£¬×ê»úÉ豸¶¨Î»·þÎñ¡£
3 Operations Base, covered warehouse and storage yard facilities for Company’s personnel, equipment and supplies, if required.
ÈçÓÐÒªÇó£¬Îª¹«Ë¾ÈËÔ±¡¢É豸¼°ÎïÁÏ×¼±¸µÄÊ©¹¤»ùµØ£¬°üÀ¨£º¿â·¿¼°´æ·ÅÔºÂäÉèÊ©¡£
4 Operations Base, offices, covered warehouse and storage yard facilities for Contractor’s personnel, equipment and supplies.
Ϊ³Ð°üÉÌÈËÔ±¡¢É豸¼°¹©Ó¦ÎïÁÏ×¼±¸µÄÊ©¹¤»ùµØ¡¢°ì¹«ÊÒ£¬°üÀ¨¿â·¿¼°´æ·ÅÔºÂäÉèÊ©¡£
5 Meals for all of Contractor’s and Contractor’s subcontractor’s personnel at Work Site up to quantity as set forth in normal personnel complement of this contract.
°´ºÏͬ¹æ¶¨µÄ±ê×¼ÈËÊý£¬ÎªÊ©¹¤ÏÖ³¡³Ð°üÉ̼°·Ö°üÉÌÈËÔ±Ìṩ²ÍÒû¡£
6 Accommodations for all of Contractor’s and Contractor’s subcontractor’s personnel at Work Site up to quantity as set forth in normal personnel complement of this contract.
°´ºÏͬ¹æ¶¨µÄ±ê×¼ÈËÊý£¬ÎªÊ©¹¤ÏÖ³¡³Ð°üÉ̼°·Ö°üÉÌÈËÔ±ÌṩסËÞ¡£
7 Meals for Contractor’s and Contractor’s subcontractor’s personnel at Work Site exceeding quantity set forth in normal personnel complement of this contract.
Ϊ³¬³öºÏͬ±ê×¼ÈËÊýµÄ³Ð°üÉ̺ͷְüÉÌÏÖ³¡Ê©¹¤ÈËÔ±Ìṩ²ÍÒû¡£
8 Accommodations for Contractor’s and Contractor’s subcontractor’s personnel at Work Site exceeding quantity set forth in normal personnel complement of this contract.
Ϊ³¬³öºÏͬ±ê×¼ÈËÊýµÄ³Ð°üÉ̺ͷְüÉÌÏÖ³¡Ê©¹¤ÈËÔ±ÌṩסËÞ¡£
9 Meals for Company’s and Company’s third party personnel less than or equal to 900 meals per month
¹«Ë¾¼°¹«Ë¾µÚÈý·½ÈËԱÿÔÂÉÙÓÚ900È˴εÄÔç²Í¡¢Îç²ÍºÍÍí²Í£¨¸÷300È˴Σ©¡£
10 Accommodations for Company’s and Company’s third party personnel less than or equal to 300 beds per month.
¹«Ë¾¼°¹«Ë¾µÚÈý·½ÈËԱÿÔÂÉÙÓÚ300È˴εÄסËÞ¡£
11 Meals for Company’s and Company’s third party personnel exceeding 900 meals per month (The rate to be LE 28.75 for breakfast and midnight meals per person & LE 57.5 for lunch and dinner per person.
¹«Ë¾¼°¹«Ë¾µÚÈý·½ÈËԱÿÔ³¬³ö900È˴εÄÔç²Í¡¢Îç²ÍºÍÍí²Í£¨Ôç²Íÿ¶Ù28.75°£°÷£¬Îç²Í¡¢Íí²Íÿ¶Ù¸÷57.5°£°÷£©¡£
12 Accommodations for Company’s and Company’s third party personnel exceeding 300 beds per month (The rate to be LE 57.50 per person per day).
¹«Ë¾¼°¹«Ë¾µÚÈý·½ÈËԱÿÔ³¬³ö300È˴εÄסËÞ(ÿÈËÿÌì57.50°£°÷)
13 Additional costs (i.e., overtime, lodging, transportation, etc.) resulting from required evacuation of Contractor’s Unit due to adverse conditions.
ÓÉÓÚ¶ñÁÓÌõ¼þ£¬ÒªÇó³Ð°üÉÌ×ê»ú³·ÀëÔì³ÉµÄ¶îÍâ·ÑÓã¨ÀýÈ磺³¬Ê±¹¤×Ê¡¢Ê³ËÞ¡¢½»Í¨µÈµÈ£©
¸½¼þ¶þ£ºÏÖ³¡¹ÜÀíLOCATION
¾®³¡
1 Marking of exact Work Location.׼ȷ±ê¶¨Ê©¹¤ÏÖ³¡¡£
2 Mine location and removal serviceµØÀ×̽²â¼°Çå³ý·þÎñ¡£
3 Work Location pad construction and maintenance.Ê©¹¤ÏÖ³¡µØÃæµÄÊ©¹¤¼°Î¬»¤¡£
4 Access roads to Work Location construction and maintenance.½øÈëÊ©¹¤ÏÖ³¡µÀ·µÄÊ©¹¤¼°Î¬»¤¡£
5 Cellar construction and maintenance.·½¾®µÄÊ©¹¤¼°Î¬»¤¡£
6 Discharge pits construction and maintenance.ÅŷųصÄÊ©¹¤¼°Î¬»¤¡£
7 Reserve pits construction and maintenance.´¢±¸³ØµÄÊ©¹¤¼°Î¬»¤¡£
8 Shallow seismic services and interpretation for identification of potential shallow gas pockets.dz²ãµØÕð·þÎñ¼°Ç±ÔÚÇ³Æø²ãʶ±ð½âÊÍ¡£
9 Suitable and appropriate space for installation of cement unit, tools, equipment and workshop/workspace on Work Location.
Ê©¹¤ÏÖ³¡Îª¹Ì¾®³µ¡¢¹¤¾ß¡¢É豸¼°¹¤×÷³µ¼äÌṩÊʵ±µÄ¿Õ¼ä¡£
10 Suitable and appropriate space for installation of electric well logging unit, tools, equipment, and workshop/workspace on Work Location.
Ê©¹¤ÏÖ³¡Îªµç²â¾®³µ¡¢¹¤¾ß¡¢É豸¼°¹¤×÷³µ¼äÌṩÊʵ±µÄ¿Õ¼ä¡£
11 Suitable and appropriate space for installation of Company’s other third party equipment (stimulation, coiled tubing unit, formation testing, production testing, etc.), tools, equipment, workshops, etc. on Work Location.
Ê©¹¤ÏÖ³¡Îª¹«Ë¾ÆäËûµÚÈý·½É豸£¨Ôö²ú´ëÊ©¡¢ÄÓÐÔÓ͹Ü×÷Òµ»ú¡¢µØ²ã²âÊÔ¡¢Éú²ú²âÊԵȣ©¡¢¹¤¾ß¼°¹¤×÷³µ¼äÌṩÊʵ±µÄ¿Õ¼ä¡£
12 Water well drilling and its maintenance including required permits.
Ë®¾®µÄ×ê̽¼°Æäά»¤£¬°üÀ¨ËùÐèÒªµÄÐí¿ÉÖ¤¡£
13 Water lines and pumps and their maintenance including required permits.
Ë®¹ÜÏß¡¢Ë®±Ã¼°ÆäάÐÞ£¬°üÀ¨ËùÐèÒªµÄÐí¿ÉÖ¤¡£
14 Removal of wreck, debris and solid waste material from Work Location and reserve pits for Contractor’s equipment, debris and waste.
´ÓÊ©¹¤ÏÖ³¡³ýÈ¥É豸²Ðº¡¡¢Ë鯬¼°¹ÌÌåÀ¬»ø£¬³Ð°üÉÌÉ豸¡¢²ÐƬ¼°·ÏÎïµÄ´¢·Å³Ø¡£
15 General cleaning of Work Location as instructed by Company representative (i.e. bury / burn trash, fill sanitation holes, back fill pits, clean work site of trash, etc.) during normal rig operation hours.
Õý³£Ê©¹¤ÆÚ¼ä£¬Óɹ«Ë¾´ú±íÒªÇóµÄ¶ÔÊ©¹¤ÏÖ³¡½øÐеÄÒ»°ãÇå½àÕûÀí¹¤×÷¡£
16 Waste disposal generated by Contractor´¦Àí³Ð°üÉÌÔì³ÉµÄÀ¬»ø¡£
17 Sanitation holes, both the digging and restoration of such.
ÎÛÎï´¢·Å³ØµÄÍÚ¾ò¼°Ô×´»Ö¸´¡£
18 Work Location coring / surveying/interpretation services for Contractor’s Insurance requirements.
¹¤×÷ÏÖ³¡È¡Ð¾¡¢¿±²ì¡¢¶Ô³Ð°üÉ̱£ÏÕÒªÇóµÄ½âÊÍ¡£
¸½¼þËÄ£ºÊ©¹¤³ÌÐòOPERATIONAL PROCEDURES
1 Drilling Unit moving, skidding and positioning procedures.
×ê»úÔËÊ䣬»¬Ðм°¶¨Î»³ÌÐò¡£
2 Transport and handling; Contractor’s procedures.³Ð°üÉÌÔËÊ估װж³ÌÐò¡£
3 Drilling Unit inspection procedures.×ê»ú¼ì²â³ÌÐò¡£
4 Contractor’s Drilling Operations Procedures.³Ð°üÉÌ×꾮ʩ¹¤³ÌÐò¡£
5 Work site Safety Procedures.ÏÖ³¡°²È«³ÌÐò¡£
6 H2S procedures.Áò»¯ÇâÔ¤·À³ÌÐò¡£
7 Well Control Procedures.¾®¿Ø³ÌÐò¡£
8 Contractor’s Emergency Response Plan.³Ð°üÉÌÓ¦¼±·½°¸¡£
9 Environment Protection Procedures.»·¾³±£»¤³ÌÐò¡£
10 Potable Water Purity Testing ProcedureÒûÓÃË®´¿¾»²âÊÔ³ÌÐò¡£
11 Tripping Procedures and hole-fill reports.ÆðÏÂ×ê³ÌÐò¼°Ìî¾®±¨¸æ¡£
12 Pipe / Tubing transport, handling and rack inspection procedures.Ì׹ܡ¢Ó͹ÜÔËÊ䣬װж¼°Åŷżì²é³ÌÐò¡£
13 Pipe & Tubing Tallying Procedures / Reports with visual thread inspection remark.Ì×¹ÜÓ͹ÜÇåµã³ÌÐò£¯Ë¿¿ÛÄ¿²â¼ì²é±ê¼Ç±¨¸æ¡£
14 Heavy Lift Safety Procedures.´ó¸ººÉÆðµõ°²È«³ÌÐò¡£
15 Work Location housecleaning and clean-up Procedures.ÏÖ³¡Óª·¿ÕûÀí¼°ÇåÀí³ÌÐò¡£
16 Contractor’s Permit to Work System / Procedures.³Ð°üÉÌÊ©¹¤ÏµÍ³£¯³ÌÐòÐí¿ÉÖ¤¡£
17 Contractor’s Lock-out / Tag-out Procedures.³Ð°üÉÌËø¶¨£¯±ê¶¨³ÌÐò¡£
18 Contractor’s Hot Work Permit System / Procedures.³Ð°üÉ̶¯»ðÐí¿É֤ϵͳ£¯³ÌÐò¡£
19 Contractor’s Confined Space Entry Procedures.³Ð°üÉÌ·â±Õ³¡µØ½øÈë³ÌÐò¡£
¸½¼þÎå ÓÐÐÎÏîÄ¿TANGIBLE ITEMS
1 Casing and other tubular goods, hangers, packers and accessories, if required.
Ì׹ܼ°ÆäËû¹Ü²Ä¡¢¹Ò¹ÜÆ÷¡¢·â¸ôÆ÷¼°¸½¼þ¡£
2 Casing shoes, float collars, baskets, centralizers, scratchers, baffles and other casing running / cementing accessories, if required.
Ì×¹ÜЬ¡¢¸¡¹¿¡¢´òÀÌÀ¶¡¢·öÕýÆ÷¡¢¹Î¹ÜÆ÷¡¢µ²°åÒÔ¼°ÆäËûÏÂÌ׹ܡ¢¹Ì¾®¸½¼þ¡£
3 Liner hangers / packers and attachments, if required.β¹ÜÐü¹ÒÆ÷¡¢·â¸ôÆ÷¼°¸½¼þ¡£
4 Wellheads, X-mas trees, valves, gaskets, replacement parts and associated attachments.¾®¿Ú×°ÖᢲÉÓÍÊ÷£¬·§ÃÅ¡¢µæÈ¦¡¢Ìæ»»Áã¼þ¼°Óйظ½¼þ¡£
5 Downhole tools and other downhole equipment for well completions.Íê¾®Óõľ®Ï¹¤¾ßºÍ¾®ÏÂÉ豸¡£
6 Tubing and attachments for completions.Íê¾®ÓÃÓ͹ܼ°¸½¼þ¡£
7 Packers, bridge plugs, cement retainers and other downhole tools necessary for drilling.·â¸ôÆ÷¡¢ÇÅÈû¡¢Ë®Äà³ÐÍл·ºÍÆäËü×ê¾®ÐèÒªµÄ¾®Ï¹¤¾ß¡£
¸½¼þÁùÏûºÄÎïÆ·CONSUMABLES
1 Drilling / Completion fluid materials, chemicals, and additives, if required.×ê¾®Òº¡¢Íê¾®Òº£¬»¯Ñ§Ò©Æ·¼°Ìí¼Ó¼Á¡£
2 Drill water for drilling / completion fluids program and washing Contractor’s Unit.×ê¾®¡¢Íê¾®ºÍÇåÏ´×ê¾®³Ð°üÉÌÉ豸ÓÃË®¡£
3 Potable water for rig operations at the rig site. ×ê»úÊ©¹¤ÏÖ³¡ÓÃÒûÓÃË®¡£
4 Potable water for any Contractor’s base camp(s) not located at the rig site.²»ÔÚ×ê»úÊ©¹¤ÏÖ³¡ÄÚµÄ×ê¾®³Ð°üÉÌÓªµØÓÃÒûÓÃË®¡£
5 Water (non-potable) for rig operations at the rig site.×ê¾®ÏÖ³¡Ê©¹¤ÓÃË®£¨·ÇÒûÓÃË®£©¡£
6 Water (non-potable) for any Contractor’s base camp(s) not located at the rig site.²»ÔÚ×꾮ʩ¹¤ÏÖ³¡ÄÚµÄ×ê¾®³Ð°üÉÌÓªµØÓÃË®£¨·ÇÒûÓÃË®£©¡£
7 Drilling and coring bits.×êÍ·¡¢È¡Ð¾×êÍ·¡£
8 Grease / compound for Company’s casing and tubing and, if applicable, Company’s rental work strings.
¹«Ë¾Ì׹ܡ¢Ó͹ܺ͹«Ë¾Ëù×âÓÃ×êÖùÓõĻÆÓÍ¡¢Ë¿¿ÛÓÍ¡£
9 Cement and additivesË®ÄàºÍÌí¼Ó¼Á¡£
10 Ring gaskets for BOPs to match wellhead and / or Company’s X-mas tree. Utilizing BOP and DSA’s as per the rig equipment list
Óë¾®¿Ú»ò²ÉÓÍÊ÷ÅäºÏʹÓõķÀÅçÆ÷µæÈ¦£¬¸ù¾Ý×ê»úÉ豸Ç嵥ʹÓõķÀÅçÆ÷ºÍ˫ͷÂÝ˨±ä¾¶¶Ì½Ú¡£
11 Welding and cutting equipment, services, consumables and personnel required on Company's equipment to extent available from Contractor's normal facilities and labor.
ÔÚ×ê¾®³Ð°üÉÌÕý³£µÄÉ豸¡¢ÈËÁ¦ÄÜÁ¦·¶Î§ÄÚ£¬ÓÃÓÚ¹«Ë¾É豸µÄº¸½Ó¡¢ÇиîÉ豸¡¢ºÄ²Ä¡¢ÈËÁ¦¼°·þÎñ¡£
12 Welding and cutting equipment, services, consumables and personnel required on Company's equipment to extent beyond that extent of Contractor's normal facilities and labor.
³¬³ö×ê¾®³Ð°üÉÌÕý³£µÄÉ豸¡¢ÈËÁ¦ÄÜÁ¦·¶Î§ÄÚ£¬ÓÃÓÚ¹«Ë¾É豸µÄº¸½Ó¡¢ÇиîÉ豸¡¢ºÄ²Ä¡¢ÈËÁ¦¼°·þÎñ¡£
13 Additional welding and cutting materials used on Company's equipment, when requested and approved in writing by Company.
×ê¾®³Ð°üÉÌÉêÇ룬¹«Ë¾ÊéÃæÅú×¼µÄÓÃÓÚ¹«Ë¾É豸É϶îÍâµÄº¸½ÓºÍÇиî²ÄÁÏ¡£
14 High pressure welding / cutting services including equipment, personnel and inspections.°üÀ¨É豸¡¢ÈËÔ±¡¢ºÍ¼ì²âÔÚÄڵĸßѹº¸½Ó¡¢Çиî·þÎñ¡£
15 Diesel Fuel for rig during well operations.Ê©¹¤ÆÚ¼ä×ê»úÓòñÓÍ¡£
16 Diesel Fuel for rig and Contractors equipment during moving operations°áǨÆÚ¼ä×ê»úºÍ×ê¾®³Ð°üÉÌÆäËûÉ豸ÓòñÓÍ¡£
17 Diesel Fuel for all heavy equipment normally assigned to the rig during rig operations (i.e. crane, fork lift / front end loader and heavy duty truck with trailer).
×ê»úÊ©¹¤ÆÚ¼äÕý³£ÅÉDzµ½ÏÖ³¡¹¤×÷µÄÖØÐÍÉ豸ÓòñÓÍ£¨¼´£ºµõ³µ¡¢²æ³µ¡¢×°ÔسµºÍÖØÐÍ¿¨³µ£©¡£
18 Diesel Fuel for Contractor’s vehicle for toolpusher.×ê¾®³Ð°üÉ̾®¶Ó³¤³µÁ¾ÓòñÓÍ¡£
19 Diesel Fuel for Contractor’s vehicle for infield tour crew change
ÓÍÇøÄÚ×ê¾®³Ð°üÉÌÈËÔ±»»°à³µÁ¾ÓòñÓÍ¡£
20 Diesel Fuel for Contractor’s personnel vehicles (i.e. vehicles for superintendents, mechanics, crew change vehicles, trucks, etc).
×ê¾®³Ð°üÉÌÈËÔ±³µÁ¾ÓòñÓÍ£¨¼´£º¼à¶½ÈËÔ±¡¢»úеʦ¡¢ÈËÔ±µ¹°àÓ󵣬¿¨³µµÈµÈ£©¡£
21 Gasoline (benzene) for Contractor’s Equipment or Contractor’s sub-contractor’s equipment.
×ê¾®³Ð°üÉÌ»òÆä·Ö°üÉÌÉ豸ÓÃÆûÓÍ¡£
22 Thread compound for Contractor’s drill pipe, drill collars or any other Contractor owned tubular
×ê¾®³Ð°üÉÌÓµÓеÄ×ê¸Ë¡¢×êîú»òÆäËû¹Ü²ÄÓÃË¿¿ÛÓÍ¡£
23 Lubricants (including lube oils and greases) for Contractor's equipment on Contractor’s Unit. (lubricant is included in the rig day rate)
×ê¾®³Ð°üÉÌÉ豸ÓÃÈ󻬼Á(°üÀ¨Èó»¬ÓͺÍÈó»¬Ö¬)£¨È󻬼ÁµÄ·ÑÓðüÀ¨ÔÚ×ê»úÈÕ·ÑÖУ©¡£
24 Lubricants for Operator’s equipment and Operator’s subcontractor’s equipment
¹«Ë¾ºÍÆä·Ö°üÉÌÉ豸ÓÃÈ󻬼Á¡£
¸½¼þÆß ³Ð°üÉÌ×ê»ú¼°ÓйØÉ豸CONTRACTOR’S UNIT & ASSOCIATED EQUIPMENT
1 Contractor's equipment as set forth in Drilling Unit Specifications and Equipment List of this executed contract.
×ê»ú¹æ·¶ËùʾµÄ³Ð°üÉ̵ÄÉ豸¼°ÂÄÐкÏͬµÄÉ豸Çåµ¥¡£
2 Gas Detection and H2S detection systems with alarms as per Contractors Standard Operational Procedure (C.6.).
·ûºÏ×ê¾®³Ð°üÉ̱ê׼ʩ¹¤³ÌÐòµÄÌìÈ»ÆøºÍÁò»¯ÇâÆøÌå̽²â±¨¾¯Æ÷¡£
3 One (1) truck and one (1) crew change vehicle for Contractor’s Unit and Personnel.
ÏÖ³¡×ê¾®³Ð°üÉÌÉ豸¡¢ÈËÔ±ÓÃÒ»Á¾¿¨³µ¡¢Ò»Á¾»»°à³µ¡£
4 Additional vehicles as required by Company on Work Location.
Ê©¹¤ÏÖ³¡¹«Ë¾ÒªÇóµÄ¶îÍâ³µÁ¾¡£
5 BOP’s handling, securing, running equipment along with test equipment (Low volume HP pump, testing tools, etc.)
·ÀÅçÆ÷µÄ²Ù×÷¡¢¹Ì¶¨¡¢ÔËÐÐÉ豸ÓëÊÔѹÉ豸£¨Ð¡ÅÅÁ¿¸ßѹ±Ã¡¢²âÊÔ¹¤¾ßµÈ£©¡£
6 Spools and adapters to match Contractor’s BOP’s to Company’s wellheads as per the equipment list
°´É豸Çåµ¥Ìṩ×ê¾®³Ð°üÉÌ·ÀÅçÆ÷Ó빫˾¾®¿ÚÏàÅäµÄÉý¸ß¶Ì½ÚºÍ±ä¾¶¶Ì½Ú¡£
7 Chicksen equipment, including one (1) – 25 ft 5000 psi flex hoses, two (2) chicksen swings and two (2) lo-torque valves with 1502 weco conns.
¸ßѹÐýת½ÓÍ·É豸£¬°üÀ¨Ò»½Ú25Ó¢³ß³¤5000psiµÄÈáÐÔ½º¹Ü£¬2¸öÐýת¶Ì½ÓºÍ2¸ö´ø1502 weco½ÓÍ·µÄÇò·§¡£
8 Shoot Nipples with bottom flanges to nipple up on top of Contractors Annular Preventer
°²×°ÔڳаüÉÌÍòÄÜ·ÀÅçÆ÷ÉÏÃæ£¬µ×²¿´ø·¨À¼µÄ·ÀÅç¹Ü¡£
9 Running tools and testing tools for Company’s wellheads and X-mas trees.
¹«Ë¾¾®¿Ú×°ÖúͲÉÓÍÊ÷µÄÉú²úºÍ²âÊÔ¹¤¾ß¡£
10 Bit breakers and bit ring gauges for 17 ½”, 12-1/4”, 8-1/2”, and 6 1/2” bits.
17 ½”¡¢12-¼”¡¢8-½”, and 6 ½” ×êͷװжÆ÷¼°×êÍ·¹æ¡£
11 All subs, bit subs, x-over subs, lifting subs, HP circulating heads, handling and running tools to fit strings provided by Contractor in Drilling Unit Specifications and Equipment List of this contract .
ËùÓеĽÓÍ·¡¢×êÍ·½ÓÍ·¡¢ÅäºÏ½ÓÍ·¡¢ÌáÉý¶Ì½Ú¡¢¸ßѹѻ·Í·¡¢ÒÔ¼°±¾ºÏͬ×ê»ú¹æ·¶ºÍÉ豸Çåµ¥Öй涨ÓÉ×ê¾®³Ð°üÉÌÌṩµÄ×ê¾ß´¦ÀíºÍÊ©¹¤¹¤¾ß¡£
12 Drill pipe as defined in the attached Appendix A, Rig Equipment.¸½¼þAÖй涨µÄ×ê¸Ë.
13 Hevi-wate pipe and drill collars as defined in the attached Appendix A, Rig Equipment.
¸½¼þA¹æ¶¨µÄ¼ÓÖØ×ê¸Ë¡¢×êîú¡£
14 Drill pipe, drill collars, subs and handling tools not provided by Contractor under this contract.
¸ù¾Ý±¾ºÏͬûÓÐÈÃ×ê¾®³Ð°üÉÌÌṩµÄ×ê¸Ë¡¢×êîú¡¢½ÓÍ·ºÍ²Ù×÷¹¤¾ß¡£
15 One drill pipe rubber for the purpose of casing protection for every stand of Contractor’s drill pipe, including all necessary tools and apparatus to install / remove DP rubber. Initial supply on location = 100 units.
ÿһÖù×ê¸Ë´øÒ»×ê¸Ë½ºÆ¤ÓÃÒÔ±£»¤Ì׹ܣ¬²¢¸½´ø×ê¸Ë½ºÆ¤µÄװжÆ÷¾ß¡£×î³õÌṩ×ê¸Ë½ºÆ¤µÄÊýÁ¿Îª100¼þ¡£
16 Replacements for the above Contractor’s drill pipe rubbers / casing protector.
ÉÏÊö×ê¸Ë½ºÆ¤/Ì׹ܱ£»¤Æ÷µÄÌæ»»¼þ¡£
17 Drill pipe rubbers / casing protector for any other drill pipe furnished by COMPANY, if required by Company.
È繫˾ҪÇóµÄ»°£¬¹«Ë¾Ìṩ×ê¸ËµÄ×ê¸Ë½ºÆ¤»òÌ׹ܱ£»¤Æ÷¡£
18 Fishing tools as required ÐèÒªµÄ´òÀ̹¤¾ß¡£
19 Drilling bits, stabilizers, hole openers, reamers, bumper subs, drilling jars, shock subs, drilling safety joints and similar in-hole equipment including replacement parts for same.
×êÍ·¡¢·öÕýÆ÷¡¢À©ÑÛÆ÷¡¢»®ÑÛÆ÷¡¢»º³å¶Ì½Ú¡¢Õð»÷Æ÷¡¢Õð»÷¶Ì½Ú¡¢°²È«½ÓÍ·¼°ÆäËûÀàËÆµÄ¾®ÏÂÉ豸£¬°üÀ¨ËûÃǵÄÌæ»»¼þ¡£
20 Casing tools for running / pulling 20”, 13-3/8", 9-5/8", 7” and 4 1/2" casing.
20”¡¢13-3/8"¡¢9-5/8"¡¢7″ and 4 1/2"Ì׹ܯðϹ¤¾ß¡£
21 Casing tools for sizes other than 20”, 13-3/8", 9-5/8", 7” and 4 1/2" casing.
20″¡¢13-3/8"¡¢9-5/8"¡¢7″ and 4 1/2"ÒÔÍâÆäËû³ß´çµÄÌ׹ܯðϹ¤¾ß¡£
22 Swabbing equipment, including lubricator, swab valve, swabs, oil savers, sinker bars, rope sockets and jars and sand line.
³éÎüÉ豸£¬°üÀ¨·ÀÅçºÐ¡¢³éÎü·§¡¢³éÎü»îÈû¡¢·ÀÅçÕÖ¡¢¼ÓÖØ¸Ë¼°³éÎüÉþ¡£
23 Basic wireline tools for Operator’s standard casing and tubing sizes including blind boxes, gauge cutters, lead impression blocks, mechanical bailers, etc.
¹«Ë¾Ì׹ܡ¢Ó͹ܳߴçµÄ»ù±¾µÄ¸ÖË¿ÉþÆðϹ¤¾ß£¬°üÀ¨¶Ù×êÓôòÀ̹¤¾ß¡¢Í¨¾¶¹æ¡¢Ç¦Ó¡Ä£¡¢ÌáÀÌͲµÈµÈ¡£
24 Containers for disposal of contractor generated refuse on work site.
´¦Àí×ê¾®³Ð°üÉÌÏÖ³¡À¬»øµÄÈÝÆ÷¡£
25 Mud pit.Äཬ³Ø
26 Any additional equipment or modifications to Contractor’s Unit required due to directions of Company.
¹«Ë¾Ö¸ÁîÒªÇóÈκζîÍâµÄÉ豸»ò¶Ô³Ð°üÉÌÉ豸µÄÕû¸Ä¡£
27 Any additional equipment or modification to Contractor’s Unit required in order to comply with requirements of regulatory authorities.
ΪÂú×ã¹ÜÀí²¿ÃŵÄÒªÇó£¬ÈκζîÍâµÄÉ豸»ò¶Ô³Ð°üÉÌÉ豸µÄÕû¸Ä¡£
28 Housekeeping services, personnel, consumables, material and supplies on Contractor’s Unit.
Óª·¿·þÎñ¡¢ÈËÔ±¡¢ÏûºÄÆ·ÒÔ¼°×ê»úÉ豸µÄ²ÄÁϹ©Ó¦¡£
29 Solvents or other special cleaning material and services when water base mud or completion fluids are used (including all of Contractor’s fluid tanks).
µ±Ê¹ÓÃË®»ùÄཬ»òÍ꾮Һʱ£¬ËùÓõÄÇåÏ´¼Á»òÆäËûÌØÊâÇåÏ´²ÄÁϺͷþÎñ£¨°üÀ¨³Ð°üÉÌËùÓеÄÄཬ¹Þ£©¡£
30 Solvent or other cleaning material and services when oil based mud is used.
µ±Ê¹ÓÃÓÍ»ùÄཬʱ£¬ËùÓõÄÇåÏ´¼Á»òÆäËûÇåÏ´²ÄÁϺͷþÎñ¡£
31 Solids control equipment on Contractor’s Unit as per the equipment list
°´É豸Çåµ¥³Ð°üÉÌ×ê»ú¹Ì¿ØÉ豸¡£
32 Additional solids control / removal equipment, if required.
ÈçÒªÇ󣬶îÍâµÄ¹Ì¿Ø¡¢³ýɳÉ豸¡£
33 Core barrels, bits, catchers, service charges and handling tools for all methods of coring, if required.
ÈçÒªÇ󣬸÷ÖÖȡо·½·¨ËùÐèÒªµÄȡоͲ¡¢È¡Ð¾×êÍ·¡¢ÑÒÐÄצ¡¢²Ù×÷¹¤¾ßºÍ·þÎñ·ÑÓá£
34 One (1) office cabin, including toilet facilities and microwave oven, for Company’s personnel.
¹«Ë¾ÈËÔ±Óð칫Ӫ·¿Ò»¶°£¬´øÎÀÉúÉèÊ©£¬²¢ÅäÓÐ΢²¨Â¯¡£
35 One (1) office cabin, including toilet facilities, for Contractor’s Toolpusher.
×ê¾®³Ð°üÉ̾®¶Ó³¤Óð칫Ӫ·¿Ò»¶°£¬´øÎÀÉúÉèÊ©¡£
36 All necessary tools and equipment to undertake maintenance of Drilling Unit.
ÓÃÒÔ×ê»úά»¤ËùÓбØÐèµÄ¹¤¾ßºÍÉ豸¡£
37 One (1) 30 ton Crane with necessary slings, shackles and spreader bars.
30¶Öµõ³µÒ»Á¾£¬´øÓбØÐèµÄÉþÌס¢µõ×°¿¨×ӺͳŸˡ£
38 One (1) Forklift / Loader capable of handling a minimum of 8 tons with detachable bucket.
Ò»Á¾´ø²ðж²ù¶·¡¢¸ººÉÖÁÉÙ8¶ÖµÄ²æ³µ¡£
39 One (1) 30 ton truck with trailer.Ò»Á¾´øÍ϶·µÄ30¶Ö¿¨³µ¡£
40 Suitable pipe racks adequate for handling all of Contractor’s Supplied tubulars
×ã¹»µÄ¹Ü¼ÜÓÃÒ԰ڷųаüÉÌÌṩµÄ¹Ü¾ß¡¢¹Ü²Ä¡£
¸½¼þ°Ë ³Ð°üÉÌ×ê»úÅä¼þ¼°ÏûºÄ²ÄÁÏ
SPARE PARTS & CONSUMABLES FOR CONTRACTOR’S UNIT
1 Repair and / or replacement of in-hole Contractor’s equipment as set forth in this Contract.
°´ºÏͬ¹æ¶¨£¬³Ð°üÉ̾®ÏÂÉ豸µÄÐÞÀí»òÌæ»»¡£
2 Kelly saver sub rubbers and replacements for all kelly's furnished by Contractor.
×ê¾®³Ð°üÉÌ·½×ê¸Ë·ÀÅç½ÓÍ·½ºÆ¤¼°Ìæ»»¼þ¡£
3 Drill pipe wipers and tubing wipers for Contractor & Company pipe.
×ê¾®³Ð°üÉÌ¡¢¹«Ë¾µÄ×ê¸Ë¡¢ÓÍ¹Ü¹Î¹ÜÆ÷¡£
5 Replacement rubber goods, elements, gaskets, seals and packing for Contractor’s BOP and well control equipment. When damaged by stripping in or out of the hole or any abnormal operation resulting in wear to the well control expendables parts.
µ±Ó÷ÀÅçÆ÷ÔÚѹÁ¦ÏÂÇ¿ÐÐÆðÏÂ×ê»òÈκηÇÕý³£Ê©¹¤µ¼Ö¾®¿ØºÄ¼þÄ¥Ëð»òËð»µÊ±£¬×ê¾®³Ð°üÉÌ·â¾®Æ÷ºÍ¾®¿ØÉ豸µÄ½ºÐ¾¡¢Ôª¼þ¡¢µæÈ¦¡¢ÓÍ·âºÍÃÜ·â¼þµÄÌæ»»¡£
6 BOP (well control system) fluid and well control system (lines, valves, etc.) for use on Contractor’s Unit.
·ÀÅçÆ÷ÓÃҺѹÓͺÍ×ê»úÉÏÓõľ®¿ØÏµÍ³£¨¹ÜÏß¡¢·§Ãŵȣ©¡£
8 Shale shaker screens ( above and including 100mesh ), mud cleaner screens above and including 150 mesh and other drill fluid solids removal equipment / consumables as may be specified, needed, or required by Company for Contractor’s solid control equipment on Contractor’s Unit with prior written approval by Company representative.
°´¹«Ë¾Ö¸¶¨¡¢ÐèÒª»òÒªÇó£¬ÊÂÏȵõ½¹«Ë¾´ú±íµÄÊéÃæÍ¬Ò⣬ÓÃÓÚ×ê¾®³Ð°üÉ̹̿ØÉ豸ÉÏ100Ä¿£¨°üÀ¨100Ä¿£©ÒÔÉϵÄÕñ¶¯É¸É¸²¼ºÍ150Ä¿£¨°üÀ¨150Ä¿£©ÒÔÉϵijýÄàÆ÷ɸ²¼£¬ÒÔ¼°ÆäËû¹Ì¿ØÉ豸¡¢ÏûºÄÁ㲿¼þ¡£
9 Lubricants for Company's equipment or Company's third party equipment.
¹«Ë¾»ò¹«Ë¾µÚÈý·½É豸ÓÃÈ󻬼Á¡£
10 Air, water, and electricity on Drilling Unit for Company’s and other contractors within the availability and priorities of the Unit.
ÔڳаüÉÌÉ豸ÌṩµÄÄÜÁ¦·¶Î§ÄÚ£¬Îª¹«Ë¾»òÆäËû³Ð°üÉÌÌṩÏÖ³¡ÓÃÆø¡¢Ë®ºÍµçÁ¦¡£
11 All necessary consumables and spare parts to maintain the Contractor’s Drilling Unit in continuous operation.
ÓÃÓÚά³Ö×ê»úÁ¬ÐøÕý³£Ê©¹¤ËùÓбØÐèµÄÏûºÄ²ÄÁϺÍÁãÅä¼þ¡£
12 Repair and / or replacement slings, straps, shackles and winch wire as necessary to maintain Unit’s safe lifting capabilities.
ÓÃÓÚ±£³ÖÉ豸°²È«ÌáÉýÄÜÁ¦µÄËùÓÐÉþÌס¢À¦ÔúÉþ¡¢µõ×°¿¨×Ó¼°½Ê³µ¸ÖË¿ÉþµÄÐÞÀí»òÌæ»»¡£
13 Consumables and spare parts not here above designated but necessary for the normal and efficient performance of Drilling Unit for services under the contracted work scope.
ÒÔÉÏûÓÐÖ¸Ã÷µÄ£¬µ«¸ù¾ÝºÏͬ¹¤×÷·¶Î§£¬Ê¹×ê»úÕý³£¡¢ÓÐЧʩ¹¤¶ø±ØÐèµÄÏûºÄ²ÄÁϺÍÁãÅä¼þ¡£ 1
14 Consumables and spare parts not here above designated but required by Company through written orders.
ÒÔÉÏûÓÐÖ¸Ã÷µÄ£¬µ«¹«Ë¾ÊéÃæÒªÇóµÄÏûºÄ²ÄÁϺÍÁãÅä¼þ¡£
¸½¼þ¾Å ×ê»úDRILLING UNIT
1 All moving services for Drilling Unit and related equipment between Company's well locations as provided for in this Contract.
°´ºÏͬ¹æ¶¨£¬¾®³¡Ö®¼ä×ê»úºÍÓйØÉ豸µÄÔËÊä·þÎñ¡£
2 Mobilization and demobilization facility, transportation, cranes, fork lift, bridle, line(s) and ancillary items.
¶¯Ç¨¡¢Ç²·µÉèÊ©£¬ÔËÊä³µÁ¾¡¢µõ³µ¡¢²æ³µ¡¢À¦ÔúÉþ¡¢¼°¸¨Öú²¿¼þ¡£
3 Required licenses, permits, clearances and all damages to non-owned company roads while mobilizing and demobilizing during Contract term.
ÔÚºÏͬÆÚÄÚ£¬ÒªÇóµÄ¸÷ÖÖÖ¤¼þ¡¢Ðí¿ÉÖ¤¡¢Ç幨ÎļþÒÔ¼°¶¯Ç¨¡¢Ç²·µÊ±¶Ô·Ç¹«Ë¾ÓµÓеÀ·µÄËð»µÅâ³¥¡£
4 Drilling Mud and Completion Fluid and associated additives.
×ê¾®Äཬ¡¢Íê¾®ÒººÍÓйØÌí¼Ó¼Á¡£
5 Drilling Mud and Completion Fluid engineering services.×ê¾®Äཬ¡¢Íê¾®ÒºµÄ¹¤³Ì·þÎñ¡£
6 Directional surveying services.¶¨Ïò²âÁ¿·þÎñ¡£
7 Directional drilling services.¶¨Ïò×ê¾®·þÎñ¡£
8 Wireline formation testing and sidewall sampling equipment and services, if required.
ÈçÒªÇ󣬵çÀµزã²âÊÔ¡¢¾®±ÚÈ¡ÑùÉ豸¼°È¡Ñù·þÎñ¡£
9 Drill stem test equipment and services, if required.ÈçÒªÇó£¬×ê¸Ë²âÊÔÉ豸ºÍ²âÊÔ·þÎñ¡£
10 Gun perforating equipment and servicesÉä¿×É豸¼°Éä¿×·þÎñ¡£
11 Cement and cementing chemicals, if required.ÈçÒªÇó£¬Ë®Ä༰¹Ì¾®»¯Ñ§Ò©Æ·¡£
12 Cementing services and personnel, if required.ÈçÒªÇ󣬹̾®·þÎñ¼°ÈËÔ±¡£
13 Cementing unit, high pressure piping, services, and personnel, if required.ÈçÒªÇ󣬹̾®³µÁ¾¡¢¸ßѹ¹ÜÏß¡¢ÈËÔ±¼°·þÎñ¡£
14 Running, landing, cementing and testing / inspection of casing strings.
ÏÂÌ׹ܣ¬¹Ì¾®ÒÔ¼°Ì×¹ÜÖùµÄ²âÊÔ¡¢¼ì²é¡£
15 Special operations to run / set casing liners and / or patches.Ï·ÅÌ׹ܳĹܺÍÐÞ²¹³Ä¹ÜµÄÌØÊâ×÷Òµ¡£
16 Special fishing services including equipment and personnel.°üÀ¨ÈËÔ±É豸ÔÚÄÚÌØÊâ´òÀÌ·þÎñ¡£
17 Electric well logging services, equipment and personnel, including string shot and back-off equipment, if required.
ÈçÒªÇ󣬵ç²â¾®·þÎñ£¬É豸ºÍÈËÔ±£¬°üÀ¨½â¿¨±¬ÕðÆ÷ºÍ½â¿¨É豸¡£
18 Weather forecasting services related to well location and Company's operations, if required.
ÈçÒªÇó£¬Óë¾®³¡ºÍ¹«Ë¾Ê©¹¤ÓйصÄÌìÆøÔ¤²â·þÎñ¡£
19 Weather forecasting services and related costs and expenses during Contractor’s Unit mobilization and demobilization prior to and after Contract term.
ºÏͬǩ¶©Ç°ºÍ½áÊøºó£¬×ê¾®³Ð°üÉ̶¯Ç¨¡¢Ç²·µ×ê»úÆÚ¼äÆøÏó·þÎñ¼°Óйصύ·Ñ¡£
20 Well production testing equipment and services (burners, separators, heaters, test tanks, movable metering piping and valves, etc.), if required.
ÈçÒªÇó£¬Ó;®²úÄܲâÊÔ¼°·þÎñ£¨È¼ÉÕÆ÷¡¢ÓÍÆø·ÖÀëÆ÷¡¢¼ÓÈÈÆ÷¡¢²âÊÔ¹Þ¡¢»î¶¯¼ÆÁ¿¹ÜÏߺͷ§Ãŵȵȣ©¡£
21 Well production testing burner booms and burner boom pedestals/supports.
Ó;®²úÄܲâÊÔȼÉÕ±Û¼°È¼ÉÕ±ÛÖ§×ù¡¢Ö§³Å¡£
22 Wellhead equipment additional to those set forth in this contract, if required.
ÈçÐèÒª£¬ºÏͬ¹æ¶¨ÒÔÍâµÄ¾®¿ÚÉ豸¡£
23 Running tools for Company's wellhead equipment, if required.
ÈçÐèÒª£¬°²×°¾®¿ÚÉ豸µÄ¹¤¾ß¡£
24 Production wireline equipment, services and personnel.
Éú²ú¸ÖÀÂÉ豸¡¢ÈËÔ±¼°·þÎñ¡£
25 Torque - turn computer equipment, services and personnel, if required.
ÈçÐèÒª£¬×Ô¶¯Ðý½ôµçÄÔÉ豸¡¢ÈËÔ±¼°·þÎñ¡£
26 Plug and abandonment in accordance with Company requirements.¸ù¾Ý¹«Ë¾ÒªÇ󣬷â¶ÂÆú¾®¡£
27 Wireline and tubing conveyed perforating services.ÀûÓøÖÀ»òÓ͹ܽøÐÐÉä¿×¡£
28 Wireline services to set bridge plugs and / or cement retainers and to run and retrieve pressure / temperature gauges and production logs.
ÀûÓøÖÀÂÉèÖÃÇÅÈûºÍ£¯»òË®ÄàÏÞλÆ÷£¬Ï·š¢È¡»Ø¾®ÏÂѹÁ¦¡¢Î¶ȼƣ¬½øÐÐÉú²ú²â¾®¡£
29 Running and setting bridge plugs and / or cement retainers on tubing string including setting cement plugs or cement squeezes.
ÔÚÓ͹ÜÖùÉÏÉèÖÃÇÅÈûºÍ£¯»òË®ÄàÏÞλÆ÷£¬°üÀ¨ÉèÖÃË®ÄàÈû»ò¼·Ë®Äà¡£
30 Assist Company’s other contractors in performing their services on the Work Site.
ÐÖúÏÖ³¡ÉϹ«Ë¾µÄÆäËû³Ð°üÉÌÍê³ÉËûÃǵķþÎñ¡£
¸½¼þ10 INSPECTIONS / CALIBRATIONS¼ì²â/У׼
1 Initial inspection of Contractor’s drill pipe, drill collars, heavy wall drill pipe, kelly, sub(s) and other in hole equipment prior to initial spud of first well. The inspection criteria will be DS-1. Level 3, latest edition.
µÚÒ»¿Ú¾®¿ª×êǰµÄÊ×´Î×ê¾ß¼ì²â£¬°üÀ¨×ê¸Ë¡¢×êîú¡¢¼ÓÖØ×ê¸Ë¡¢·½×ê¸Ë¡¢¶Ì½ÚÒÔ¼°ÆäËû¾®ÏÂÉ豸¡£¼ì²â±ê׼Ϊ×îа汾DS-1. 3¼¶¡£
2 Subsequent inspections of Contractor’s drill pipe after every 50,000 ft of newly drilled hole. The inspection criteria will be DS-1. Level 3, latest edition.
ÒÔºó¶Ô×ê½øµ½5ÍòÓ¢³ßµÄ×ê¸Ë¼ì²âÒ»´Î¡£¼ì²â±ê׼Ϊ×îа汾DS-1. 3¼¶¡£
3 Subsequent inspections of Contractor’s BHA, including heavy wall drill pipe, drill collars and sub(s) after every well. The inspection criteria will be DS-1. Level 3, latest edition.
ÿ¿Ú¾®Íê¾®ºó£¬×ê¾®³Ð°üÉÌ¶ÔÆä×ê¾ß×éºÏ£¬°üÀ¨¼ÓÖØ×ê¸Ë¡¢×êîú¼°½ÓÍ·¼ì²âÒ»´Î¡£¼ì²â±ê׼Ϊ×îа汾DS-1. 3¼¶¡£
4 All repairs, including re-cuts and re-facings, of any damaged drill pipe, drill collars, heavy wall drill pipe, kelly, sub(s) and other in hole equipment during routine inspections.
³£¹æ¼ì²âÖУ¬ÈκÎË𻵵Ä×ê¸Ë¡¢×êîú¡¢¼ÓÖØ×ê¸Ë¡¢·½×ê¸Ë¼°¾®ÏÂÆäËû×ê¾ßµÄÐÞÀí£¬°üÀ¨ÖØÐÂÇÐÏ÷¡¢±íÃæÖØÐ´¦Àí¡£ 2
5 Inspection of Contractor’s derrick / mast, deadline anchor, bails, elevators, swivel, power swivel and other lifting equipment.
×ê¾®³Ð°üÉ̾®¼Ü¡¢µØÃª¡¢Ë®ÁúÍ·Ìá»·¡¢µõ¿¨¡¢Ë®ÁúÍ·¡¢¶¯Á¦Ë®ÁúÍ·¼°ÆäËûÌáÉýÉ豸µÄ¼ì²â¡£
6 Inspection of Contractor’s slings, shackles, straps, bridle line, raising lines, tugger lines and other lifting lines.
×ê¾®³Ð°üÉÌÉþÌס¢µõ×°¿¨×Ó¡¢À¦ÔúÉþ¡¢¹Ì¶¨¸ÖÀ¡¢ÌáÉýÀÂÉþ¡¢µçºù«¸ÖË¿ÉþºÍÆäËûÌáÉýÉ豸µÄ¼ì²â¡£
7 Inspection of HP hoses / lines, chicksans, and fixed pipe lines attached to or used by the Contractor’s Unit for operations.
¸ßѹˮÁú´ø¡¢¸ßѹÐýת½ÓÍ·ºÍ¸½ÓÚ×ê»úÉÏ»òÓÃÓÚ×ê»úÊ©¹¤µÄ¹Ì¶¨¹ÜÏß¼ì²â¡£
8 Calibration of H2S detectors / systems and alarms every 6 months.
ÿ6¸öÔ¶ÔÁò»¯Çâ̽²â±¨¾¯Æ÷УÑéÒ»´Î¡£
9 Calibration of Contractor’s torque gauges, weight indicators, pressure gauges and other calibrated gauges.
×ê¾®³Ð°üÉÌŤ¾ØÒÇ¡¢Ö¸ÖØÆ÷¡¢Ñ¹Á¦±í¼°ÆäËûÒDZíµÄУÑé¡£
10 Repairs / replacements related to any defects found by above inspections and / or calibrations.
¶ÔÒÔÉϼì²â»òУÑéÖÐÓйÊÕÏÒÇ±í¡¢É豸µÄÐÞÀí»òÌæ»»¡£
11 Inspection of Company’s tubing, casing, completion components, and other downhole tools.
¹«Ë¾Ó͹ܡ¢Ì׹ܡ¢Íê¾®É豸¼°ÆäËû¾®Ï¹¤¾ßµÄ¼ì²â¡£
12 Visual inspection of Company’s tubing / casing as run / pulled and included in tally report.
ÆðÏÂÓ͹ܡ¢Ì×¹Üʱ£¬×öÄ¿²â¼ì²é±¨¸æ²¢×÷ºÃ¼Ç¼¡£
as per Contractor’s Management and Maintenance System and / or regulatory requirements°´×ê¾®³Ð°üÉÌάÐÞ¹ÜÀíÖÆ¶È»ò¹æÕÂÒªÇó¡£
¸½¼þʮһ ÈËÔ±¹ÜÀí PERSONNEL
1 Contractor's personnel as detailed in this contract for the normal and safe operation of the Drilling Unit including replacement, subsistence, insurance, wages, benefits and all other costs related thereto.
°´ºÏͬ£¬³Ð°üÉÌÌṩ°²È«Õý³£Ê©¹¤µÄÈËÔ±£¬°üÀ¨ÆäÈËÔ±µÄÌæ»»¡¢Éú»î¡¢±£ÏÕ¡¢¹¤×Ê¡¢¸£ÀûºÍÓëËûÃÇÏà¹ØµÄÒ»Çл¨·Ñ¡£
2 Extra personnel provided by Contractor in excess of normal complement as per contract when requested and approved in writing by Company.
Èç×ê¾®³Ð°üÉÌÉêÇë²¢µÃµ½¹«Ë¾ÊéÃæ×¼Ðí£¬×ê¾®³Ð°üÉÌÌṩµÄ³¬³öºÏͬ¹æ¶¨µÄ¶îÍâÈËÔ±
3 Labor required at Contractor’s Unit to unload or load Contractor's, Company's and Company's third party supplies, equipment, consumables and equipment within the capacity of the rig crews and equipment provided.
ÔÚ×ê¾®³Ð°üÉÌÈËÔ±¼°É豸µÄÄÜÁ¦·¶Î§ÄÚ£¬×ê¾®³Ð°üÉÌ¡¢¹«Ë¾ºÍµÚÈý·½·þÎñ¹«Ë¾ÏÖ³¡ÎïÁÏ¡¢É豸¡¢ÏûºÄ²ÄÁϵÄװж¡£
4 Labor at Company's Operations Base and warehouse to load and unload Company's supplies and equipment
ÔÚ¹«Ë¾Ê©¹¤»ùµØ¡¢¿â·¿×°Ð¶¹«Ë¾ÎïÁÏ¡¢É豸ÐèÒªµÄÀ͹¤
5 Safety and professional training courses for Contractor’s personnel, including all required well control certification.
×ê¾®³Ð°üÉÌÈËÔ±µÄ°²È«Ö°ÒµÅàѵ£¬°üÀ¨ËùÓÐÒªÇóµÄ¾®¿ØÖ¤¡£
6 Safety and professional training courses provided by Contractor for Company’s personnel.
ÓÉ×ê¾®³Ð°üÉÌΪ¹«Ë¾ÈËÔ±ÌṩµÄ°²È«Ö°ÒµÅàѵ¡£
7 All associated formalities and logistics related to travel documents, health certificates, visas, work permits, etc. for Contractor’s Personnel.
Óë×ê¾®³Ð°üÉÌÈËÔ±ÂÃÐÐÖ¤¼þ¡¢½¡¿µÖ¤Ê顢ǩ֤¡¢¹¤×÷Ðí¿ÉÖ¤µÈÓйصÄËùÓÐÊÖÐø¼°ºóÇÚ·þÎñ¡£
¸½¼þÊ®¶þ °²È«/°²±£SAFETY/SECURITY
1 H2S detection equipment on Contractor’s Unit including alarm system and sufficient charged self-contained breathing apparatus on drill floor and in mud pit/processing area for key personnel on rig floor, shaker area, mud pit area, and testing equipment area. ( As per Contractor’s Safety Management System
Áò»¯Çâ̽²âÒÇÆ÷£¬°üÀ¨×ę̂¡¢Äཬ´¦ÀíÇø×°Óб¨¾¯ÏµÍ³£¬×ę̂¡¢Õñ¶¯É¸¡¢Äཬ³Ø¡¢É豸²âÊÔÇøµÄ¹Ø¼üÈËÔ±ÓÐ×ã¹»µÄºôÎüÆ÷¡££¨°´ÕÕ×ê¾®³Ð°üḚ́²È«¹ÜÀíÖÆ¶È£©
2 First aid and medical supplies for Contractor’s Unit on Work Location.
×ê¾®³Ð°üÉÌÏÖ³¡Óü±¾ÈºÍÒ½ÁÆÎïÆ·
3 Disposal of all personal and industrial wastes generated by Contractor’s Unit and personnel during the work period at an approved site and in an approved manner.
ÔÚ¹«Ë¾×¼ÐíµÄ³¡µØ£¬ÒÔ¹«Ë¾ÔÊÐíµÄ·½Ê½´¦ÀíÊ©¹¤ÆÚ¼äÓÉ×ê¾®³Ð°üÉÌÈËÔ±¡¢É豸Ôì³ÉµÄÉú»î¡¢¹¤ÒµÀ¬»ø¡£
4 Safety equipment associated with completion operations.ÓëÍ꾮ʩ¹¤ÓйصݲȫÉ豸
5“Near Miss” accident reports.“×¼”ʹʱ¨¸æ
6 All necessary safety and protective clothing for Contractor’s personnel
×ê¾®³Ð°üÉÌÈËÔ±ËùÓбØÐèµÄ°²È«±£»¤·þ
7 Safety reports / forms for all of Contractor’s policies, procedures, programs as detailed in Contractor’s Operating Procedures kept permanently on Work Site.
³¤ÆÚ´æ·ÅÔÚÊ©¹¤ÏÖ³¡£¬×ê¾®³Ð°üÉÌÊ©¹¤³ÌÐòÖÐÏêϸ¹æ¶¨µÄ³ÌÐò¡¢Õþ²ßµÄ°²È«±¨¸æÐÎʽ
8 Security for Contractor’s Drilling Unit and Company’s equipment on Work Location.
Ê©¹¤ÏÖ³¡×ê¾®³Ð°üÉ̺͹«Ë¾É豸µÄ°²È«±£ÕÏ
¸½¼þÊ®Èý ÔËÊä/ͨѶ·þÎñ TRANSPORTATION / COMMUNICATION SERVICES
1 Supply handling and transportation of equipment, ancillary items and crews for transporting Contractor's equipment, materials, spare parts, consumables and supplies between point of origin and Company’s Base and subsequent Work Sites prior to Commencement Date of this Contract and during Contract term.
¿ª×êǰ¼°ÂÄÐкÏͬÆÚ¼ä£¬×ê¾®³Ð°üÉ̸ºÔð°ÑÆäÉ豸¡¢ÈËÔ±¡¢²ÄÁÏ¡¢Á㲿¼þ¡¢ÏûºÄ²ÄÁÏºÍÆäËû¹©Ó¦Æ·´ÓÔʼµØÔËÍù¹«Ë¾»ùµØÒÔ¼°ËæºóµÄ¾®¼ä°áǨ¡£
2 Supply handling and transportation of equipment, ancillary items and crews for transporting Company's equipment, materials, consumables and supplies between point of origin and Company’s Base during Contract term.
ÂÄÐкÏͬÆÚ¼ä£¬¹«Ë¾¸ºÔð°ÑÆäÉ豸¡¢²ÄÁÏ¡¢ÏûºÄ²ÄÁÏºÍÆäËû¹©Ó¦Æ·´ÓÔʼµØÔËÍù¹«Ë¾»ùµØ¡£
3 Supply handling transportation of equipment, ancillary items and crews for transporting Contractor's equipment, materials, consumables and supplies and for handling Contractor’s Unit and base of operation after termination date of this Contract.
ºÏͬ½áÊøºó£¬×ê¾®³Ð°üÉ̸ºÔðÆäÉ豸¡¢²ÄÁÏ¡¢ÏûºÄ²ÄÁÏºÍÆäËûÎïÁϵÄÔËÊäºÍ´¦Àí
4 Sufficient suitable cargo baskets, tackle and ancillary items for use in transporting Contractor's supplies and equipment to and from Contractor’s Unit on supply truck.
×ê¾®³Ð°üÉÌÔËÊäÆäÉ豸¡¢ÎïÁÏʱÓÐ×ã¹»µÄ×ê¾ßºÐ×Ó¡¢µõ×°Æ÷е¼°¸¨ÖúÉ豸
5 Transportation for Company's supplies and equipment between Company’s Operations Base (Salam Base) to / from Work Locations up to capabilities of Contractor’s standby truck, if required.
ÈçÒªÇó£¬ÔÚ×ê¾®³Ð°üÉ̱¸Óÿ¨³µµÄ¸ºÔØÄÚ£¬ÔÚ¹«Ë¾Ê©¹¤»ùµØ£¨Æ½°²»ùµØ£©ºÍÊ©¹¤ÏÖ³¡Ö®¼äÔËË͹«Ë¾µÄÉ豸¼°ÎïÁÏ¡£
6 All transportation for Contractor's equipment, material, personnel and supplies between Contractor's operations base and Contractor’s Unit on Work Location.
×ê¾®³Ð°üÉÌÊ©¹¤ÓªµØºÍÊ©¹¤ÏÖ³¡Ö®¼äËùÓÐÉ豸¡¢²ÄÁÏ¡¢ÈËÔ±¼°ÆäËûÎïÆ·µÄÔËËÍ¡£
7 All transportation for Contractor's personnel between Company’s Operations Base air strip and Contractor’s Unit on Work Location.
×ê¾®³Ð°üÉÌÈËÔ±´Ó¹«Ë¾Ê©¹¤»ùµØµ½×꾮ʩ¹¤ÏÖ³¡Ö®¼äµÄ½»Í¨¡£
8 Labor and equipment at Contractor's Operations Base and warehouse to load and unload Contractor's supplies and equipment.
×ê¾®³Ð°üÉÌÔÚÓªµØºÍ¿â·¿×°Ð¶ÆäÎïÁÏ¡¢É豸ËùÐèµÄװжÈËÔ±ºÍÉ豸
9 All transportation (including driver, vehicle, permits, license, fuel, etc) for Contractor's personnel for “Crew Change” purposes between Contractor’s point of origin to / from Contractor’s rigsite).
×ê¾®³Ð°üÉÌÈËÔ±µ¹°à£¬´ÓÔʼ³ö·¢µØµ½Ê©¹¤ÏÖ³¡»ò´ÓÊ©¹¤ÏÖ³¡µ½Ôʼ³ö·¢µØËùÓеĽ»Í¨·ÑÓ㨰üÀ¨Ë¾»ú¡¢³µÁ¾¡¢Ðí¿ÉÖ¤¡¢¼Ýʻ֤¡¢ÓÍÁϵȣ©
10 All air and freight transportation, including clearing expenses, for Contractor's material to Contractor’s operations base.
×ê¾®³Ð°üÉÌÔËËͲÄÁϵ½ÆäÊ©¹¤ÏÖ³¡ËùÓеĿÕÔË·Ñ£¬°üÀ¨Ç幨·ÑÓá£
11 All transportation outside Egypt for Contractor’s supplies, equipment and personnel.
×ê¾®³Ð°üÉÌÎïÁÏ¡¢É豸¼°ÈËÔ±ÔÚ°£¼°¾³ÍâµÄËùÓÐÔËÊä¡£
12 All transportation outside Egypt for Company’s supplies, equipment and personnel.
¹«Ë¾ÎïÁÏ¡¢É豸¼°ÈËÔ±ÔÚ°£¼°¾³ÍâµÄËùÓÐÔËÊä¡£
13 Transportation of Company’s equipment between Work Sites up to the limitations of the standby truck during daywork operations.
ÔÚ±¸Óÿ¨³µµÄ¸ºÔØÄÚ£¬°×ÈÕÊ©¹¤ÆÚ¼ä£¬Ê©¹¤ÏÖ³¡Ö®¼ä¹«Ë¾É豸µÄÔËÊä¡£
14 Equipment and normal rig crew personnel for loading and unloading of Contractor’s equipment, Company’s equipment and Company’s third party equipment on Work Site when utilizing Contractor furnished equipment
µ±ÀûÓÃ×ê¾®³Ð°üÉÌÌṩµÄÉ豸ÔÚÏÖ³¡×°Ð¶×ê¾®³Ð°üÉ̵ÄÉ豸¡¢¹«Ë¾µÄÉ豸ÒÔ¼°µÚÈý·½µÄÉ豸ʱËùÐèµÄÉ豸ºÍÕý³£µÄ°à×éÈËÔ±¡£
15 Telephone, radio, telex and satellite communication equipment as set forth in Contractor’s Drilling Unit Equipment List as part of this contract and / or communication system required for Contractor’s usage.
°´×ê¾®³Ð°üÉÌÉ豸Çåµ¥£¨×÷ΪºÏͬµÄÒ»²¿·Ö£©Ö¸Ã÷µÄ»ò³Ð°üÉ̱ØÐèʹÓõÄͨѶϵͳ£¬µç»°¡¢ÎÞÏߵ硢´«ÕæºÍÎÀÐÇͨѶÉ豸¡£
16 Telephone, radio, telex and satellite communication equipment for Company’s usage.
¹«Ë¾Ê¹Óõĵ绰¡¢ÎÞÏߵ硢´«ÕæºÍÎÀÐÇͨѶÉ豸¡£
17 Necessary permits and licenses for above telephone radio and telex communications equipment for Contractor’s system.
×ê¾®³Ð°üÉÌΪʹÓÃÉÏÊöͨѶÉ豸ËùÐèÒªµÄÐí¿ÉÖ¤ºÍÖ´ÕÕ¡£
18 Necessary permits and licenses for above telephone radio and telex communications equipment for Company’s system.
¹«Ë¾ÎªÊ¹ÓÃÉÏÊöͨѶÉ豸ËùÐèÒªµÄÐí¿ÉÖ¤ºÍÖ´ÕÕ¡£
19 Customs duties, fees, taxes, licenses, import tariffs, pilotage fees, wharfage fees, canal fees and cost and / or similar charges, including any brokerage relating to COMPANY’s equipment, supplies and replacement and / or spare parts.
Ó빫˾É豸¡¢ÎïÁϹ©Ó¦¡¢Ìæ»»¼þÒÔ¼°±¸ÓüþÓйصĽø¿Ú¹ØË°¡¢·þÎñ·Ñ¡¢ÏúÊÛ˰¡¢Ðí¿ÉÖ¤¡¢Áì¸Û·Ñ¡¢¸Û¿Ú·Ñ¡¢Ô˺ӹÜÀí·ÑÒÔ¼°°üÀ¨ÈκÎÊÖÐø·ÑÔÚÄÚµÄÀàËÆ·ÑÓá£
20 Contractor’s main base office, warehouse, yard, facilities, transportation equipment, accommodations, including for families if any, etc., should Contractor deem this facility be necessary.
Èç¹û×ê¾®³Ð°üÉÌÈÏΪÓбØÒª£¬Ö÷ÓªµØ°ì¹«ÊÒ¡¢¿â·¿¡¢Í¥Ôº¡¢Éú»îÉèÊ©¡¢ÔËÊäÉ豸¡¢°üÀ¨¼ÒÊô£¨Èç¹ûÓУ©ËÞÉáµÈ¡£
APPENDIX D£º Scope of Work¸½¼þÊ®ËÄ ¹¤×÷·¶Î§
AGeneral: ×ÜÔò£º
The CONTRACTOR shall direct, supervise and control drilling and associated operations as defined herein and assume liabilities as provided for in the CONTRACT, consequently the CONTRACTOR shall drill, work over, sidetrack and complete well(s) in accordance to the well specification on a Day rate basis as more fully described herein:
×ê¾®³Ð°üÉÌÓ¦Ö¸µ¼¡¢¼à¶½¡¢¿ØÖƱ¾¸½¼þ¹æ¶¨µÄ×ê¾®ºÍÏà¹ØµÄÊ©¹¤£¬²¢°´±¾ºÏͬµÄ¹æ¶¨³Ðµ£ÔðÈΡ£×ê¾®³Ð°üÉ̸ù¾Ý¾®µÄÉè¼Æ¹æ·¶ÔÚÈշѵĻù´¡ÉϽøÐÐ×ê¾®¡¢ÐÞ¾®¡¢²à×ê¾®¡¢Í꾮ʩ¹¤£¬±¾¸½¼þ¶Ô´Ë×ö¸üÏêϸµÄÃèÊö¡£
1.Furnish all equipment, labor, materials and services provided by CONTRACTOR as per the provisions outlined in Appendix A &B
¸ù¾Ý¸½¼þAºÍBµÄ¹æ¶¨£¬³Ð°üÉÌÌṩÆäÓ¦¸ÃÌṩµÄËùÓÐÉ豸¡¢ÈËÁ¦¡¢²ÄÁϼ°·þÎñ¡£
2.Carry out and co-ordinate all preparations for moving of the Contractor’s items to and from the well (s),
¸ºÔð¡¢Ðµ÷ÔËÊäÆä²ÄÁÏ¡¢É豸³öÈë¾®³¡µÄËùÓÐ×¼±¸¹¤×÷¡£
3.Clean up the location(s) after drilling or testing as the case may be as per the provisions outlined in Appendix C
°´ÕÕ¸½¼þCµÄ¹æ¶¨£¬¸ù¾Ýµ±Ê±µÄÇé¿ö£¬×ê¾®»òÊÔ¾®ºóÇåÀí¾®³¡¡£
4.Assistance of any services and personnel which may be supplied by the COMPANY or the other Contractor's, the CONTRACTOR shall be solely responsible for the operation of the Contractor’s equipment including but not limited to the rigging-up, testing, running and rigging-down of the Contractor’s equipment upon the completion of a job).
¹«Ë¾»òÆäËû³Ð°üÉÌ¿ÉÄÜÌṩÈËÔ±ºÍ°ïÖú£¬µ«×ê¾®³Ð°üÉÌ¶ÔÆäÉ豸µÄÊ©¹¤¸ºÈ«²¿ÔðÈΣ¬°üÀ¨µ«²»ÏÞÓÚÉ豸µÄ°²×°£¬²âÊÔ£¬ÔËÐÐÒÔ¼°Í깤ºóµÄ²ðж¡£
5.The CONTRACTOR shall provide assistance to the other Contractor's performing other services relating to the WORK.
×ê¾®³Ð°üÉÌÓ¦¶ÔÓë¸ÃÊ©¹¤ÓÐ¹ØµÄÆäËû·þÎñ³Ð°üÉÌÌṩ°ïÖú¡£
6.Furthermore the CONTRACTOR shall provide water and electric power (within the capacity of the rig generators) to the Company’s and the Company’s sub contractors accommodation and work cabins, and light to facilitate safe conduct of the WORK during the hours of darkness on the Well and drilling site, unless specifically provided by the COMPANY in accordance with Provisions by COMPANY and CONTRACTOR part.
³ý·Ç¹«Ë¾ÓÐÌØ±ð¹æ¶¨£¬¸ù¾ÝºÏͬ˫·½µÄ¹æ¶¨£¬×ê¾®³Ð°üÉÌӦΪ¹«Ë¾ºÍ¹«Ë¾ÆäËû·Ö°üÉ̵ÄËÞÉá¡¢°ì¹«Óª·¿Ìṩˮ¡¢µçÁ¦£¨ÔÚ·¢µç»úµÄ¹¦ÂÊ·¶Î§ÄÚ£©ÕÕÃ÷£¬ÒÔ±ãÔÚÒ¹¼ä°²È«¹¤×÷¡£
The CONTRACTOR shall submit to the COMPANY prior to the Commencement Date a written procedure for the following operations.
¿ª¹¤Ç°£¬×ê¾®³Ð°üÉÌÓ¦Ïò¹«Ë¾ÊéÃæÌá½»ÒÔÏÂÊ©¹¤³ÌÐò£º
Rig moving, rigging up and mast erection.• ×ê»ú°áǨ¡¢°²×°¼°²ðж³ÌÐò¡£
Drilling (tripping, reaming, tight hole procedure, stuck pipe),
×ê¾®£¨ÆðÏÂ×ê¡¢»®ÑÛ¡¢¾®¾¶ËõС¡¢¿¨×꣩³ÌÐò¡£
Blow out preventer testing, flow checks, use of trip tanks, diverter systems,
·ÀÅç²âÊÔ¡¢½ØÁ÷¡¢Ñ»·¹ÞʹÓᢷÖÁ÷Æ÷ϵͳ³ÌÐò¡£
Emergency procedures for gas, fire and blowout such emergency procedures shall as a minimum be in accordance with the Specifications and Standards contained within the CONTRACT.
´¦ÀíÆøÓ¿¡¢»ðÔÖ¼°¾®ÅçµÄÓ¦¼±³ÌÐò¡£±¾ºÏͬÀïµÄ¹æ·¶ºÍ±ê×¼ÊÇ×îµÍµÄÒªÇó¡£
B.Location: ÏÖ³¡
Access Roads:½øÈëµÀ·£º
The CONTRACTOR shall only access the site on the access roads provided by the COMPANY which shall be used in accordance with the instructions given herein.
×ê¾®³Ð°üÉÌÖ»ÄÜͨ¹ý¹«Ë¾ÌṩµÄµÀ·½øÈëÏÖ³¡£¬²¢¸ù¾Ý¹«Ë¾ÔÚºÏͬÖиøÓèµÄÖ¸ÁîʹÓøýøÈëµÀ·¡£
Drilling Location:×ê¾®ÏÖ³¡
The CONTRACTOR shall use the location in accordance with the instructions given herein and shall adhere to the "Hazardous Area Classification" as will be defined within the CONTRACT.
³Ð°üÉÌÓ¦¸ù¾ÝºÏͬÖеÄÖ¸ÁîʹÓÃÏÖ³¡£¬²¢°´ÕÕºÏͬÖеĹ涨¶ÔΣÏÕÇøÓò½øÐзÖÀà¡£
The CONTRACTOR shall be responsible for the layout of the Contractor’s items and shall ensure sufficient space and location for the placement of the Company’s and the Company’s other Contractor's items.
×ê¾®³Ð°üÉÌÓ¦¸ºÔðÆäÉ豸¼°²ÄÁϵÄÏÖ³¡²¼Öã¬È·±£¹«Ë¾¼°¹«Ë¾ÆäËû³Ð°üÉÌÉ豸»ò²ÄÁÏÓÐ×ã¹»µÄ°²·Å¿Õ¼ä¡£
At the end of operations, the CONTRACTOR shall be responsible for leaving the location in a safe, clean, tidy state. If location was built by Contractor then all pits shall be re-instated to a standard acceptable to the COMPANY REPRESENTATIVE.
Ê©¹¤½áÊøºó£¬×ê¾®³Ð°üÉ̸ºÔðʹÏÖ³¡´¦ÓÚ°²È«¡¢¸É¾»¡¢Õû½àµÄ״̬¡£Èç¹ûÏÖ³¡ÓÉ×ê¾®³Ð°üÉÌÐÞ½¨£¬ÄÇôӦ¶ÔÏÖ³¡ËùÓеÄÍÚ¾ò½øÐлØÌ»Ö¸´µ½¹«Ë¾´ú±í¿ÉÒÔ½ÓÊܵÄ״̬¡£
Well¾®ÑÛ
The CONTRACTOR shall execute the WORK in accordance with the Company’s Drilling and work over Programs and the specific Specifications and standards applicable to each Well.
×ê¾®³Ð°üÉÌÓ¦¸ù¾Ý¹«Ë¾µÄ×ê¾®¡¢ÐÞ¾®³ÌÐòÒÔ¼°Ã¿¿Ú¾®ÊÊÓõÄÌØ¶¨µÄ¹æ·¶¡¢±ê×¼½øÐÐÊ©¹¤¡£
C.Compensation Basis:²¹³¥ÔÔò£º
Daily rate Scope of WorkÈշѹ¤×÷·¶Î§
The Contractor’s day rate Scope of Work will be to drill wells, usually in search of hydrocarbons in the form of oil or gas, with the drilling rig and all associated equipment described provided by COMPANY and CONTRACTOR. The Scope of Work shall include, but not be limited to, drilling, deepening, completing, work over, susn and abandoning operations. The drilling unit and available Equipment and Personnel will be used to support all other operations the COMPANY wishes to perform in wells, including but not limited to testing and logging.
×ê¾®³Ð°üÉ̵ÄÈշѹ¤×÷·¶Î§ÊÇ£¬Í¨³£ÎªÑ°ÕÒÓÍÆøÐÎʽµÄ̼Ç⻯ºÏÎÀûÓúÏͬÖÐÃèÊöµÄ×ê»úºÍËùÓÐÏà¹ØÉ豸½øÐÐ×ê¾®¡£¹¤×÷·¶Î§°üÀ¨£¬µ«²»ÏÞÓÚ£¬×ê½ø¡¢¼ÓÉÍê¾®¡¢ÐÞ¾®¡¢Í£¹¤´ý»úºÍÆú¾®Ê©¹¤¡£×ê»ú¡¢Ïà¹ØÉ豸ºÍÈËÔ±Ò²½«ÓÃÓÚÐÖú¹«Ë¾Ï£ÍûÍê³ÉµÄËùÓÐÆäËûÊ©¹¤£¬°üÀ¨£¬µ«²»ÏÞÓÚ£¬ÊÔ¾®ºÍ²â¾®¡£
The CONTRACTOR shall undertake:×ê¾®³Ð°üÉ̽«´ÓÊ£º
The operation, maintenance, inspection, calibration and repair of all equipment itemized as will be specified in Provision by COMPANY and CONTRACTOR
¸ºÔðºÏָͬ¶¨µÄËùÓÐÖðÏîÉ豸µÄÔËÐС¢Î¬»¤£¬¼ì²é¡¢Ð£×¼¼°ÐÞÀí¡£
The drilling of Wells to a depth to be specified by the COMPANY. Such depth shall not exceed the rated depth of the drilling rig as will be specified in Provisions by COMPANY and CONTRACTOR without the Contractor’s written consent. At depths determined by the COMPANY, the CONTRACTOR shall assist the Company’s logging contractor in the running of wire line logs, tests and perforating operations.
×ê½øµ½¹«Ë¾Ö¸¶¨µÄÉî¶È£¬Ã»ÓÐ×ê¾®³Ð°üÉ̵ÄÊéÃæÍ¬Ò⣬¸ÃÉî¶È²»»á³¬¹ýºÏͬÖй涨µÄ×ê»ú¶î¶¨Éî¶È¡£ÔÚ¹«Ë¾¾ö¶¨µÄijЩ²ã¶Î£¬×ê¾®³Ð°üÉÌÐÖú¹«Ë¾µÄ²â¾®³Ð°üÉ̽øÐеçÀ²⾮¡¢²âÊÔ¼°Éä¿×¹¤×÷¡£
The completion and re-completion of wells utilizing the CONTRACTORS items and materials supplied by the COMPANY. This may include nippling of spools, manipulating of tubing and packers, milling and retrieving of down hole equipment, fishing, cementing and squeezing and supporting perforating, production logging, wire line, sample taking and well killing operations.
ʹÓÃ×ê¾®³Ð°üÉ̵ÄÉ豸ºÍ¹«Ë¾ÌṩµÄ²ÄÁϽøÐÐÍê¾®ºÍ¶à´ÎÍê¾®×÷Òµ£¬Õâ°üÀ¨·ÀÅçÆ÷µÄװж£¬ÏÂÓ͹ܡ¢·â¸ôÆ÷£¬¾®ÏÂÉ豸µÄĥϳ¡¢Êջأ¬´òÀÌ£¬¹Ì¾®£¬¼·Ë®Ä࣬ÐÖúÉä¿×¡¢Éú²ú²â¾®¡¢µçÀ²⾮¡¢È¡Ñù¼°Ñ¹¾®×÷Òµ¡£
The work over of wells utilizing materials supplied by the COMPANY.
ÀûÓù«Ë¾ÌṩµÄ²ÄÁϽøÐÐÐÞ¾®×÷Òµ¡£
The susn or abandonment of wells utilizing materials supplied by the company.
ÀûÓù«Ë¾ÌṩµÄ²ÄÁϽøÐÐÔÝÍ£»òÆú¾®Ê©¹¤¡£
The measurement and recording of all lengths and dimensions of tool, materials and components in the hole at all times. The Company’s items (materials and equipment) shall be marked and identified at the time of measurement, i.e., casing and tubing.
ʼÖÕ¶Ô¾®Ï¹¤¾ß¡¢²ÄÁÏ¡¢×ê¾ßµÄ³¤¶È¼°ÆäËû³ß´ç½øÐжÈÁ¿²¢×öºÃ¼Ç¼¡£ÔÚ¶ÈÁ¿¹«Ë¾ÌṩµÄÎïÁÏ£¨²ÄÁϺÍÉ豸£©Ê±£¬¶ÔÌ׹ܺÍÓ͹ÜÒª½øÐбê¼ÇºÍ±êʾ¡£
To immediately stop drilling and notify the COMPANY in the event that the CONTRACTOR encounters a formation which reasonably appears to be oil or gas bearing and/or of litho logical importance according to the Company’s instructions.
¸ù¾Ý¹«Ë¾µÄָʾ£¬×êµ½ÓÍÆøÏÔʾ²ãºÍ¾ßÓÐÖØÒªÑÒÐԵĵزãʱ£¬Ó¦Á¢¼´Í£Ö¹×ê½ø²¢Í¨Öª¹«Ë¾¡£
To immediately notify the COMPANY if circulation is lost or an impenetrable formation is encountered and will in the meantime exert every reasonable effort to overcome such difficulty according to good oil field practices.
Èç¹û·¢Éú¾®Â©»òÓöµ½ÄÑ×êµØ²ã£¬Ó¦Á¢¼´Í¨Öª¹«Ë¾£¬²¢Í¬Ê±¸ù¾ÝÓÍÌï±ê×¼¹ßÀý¾¡Ò»ÇпÉÄܿ˷þÕâÑùµÄÀ§ÄÑ¡£
To immediately take precautionary action at least in accordance with the Company’s Well Control Procedure in the event that an unexpectedly high pressure formation is encountered and/or in the event of any sign that the well may be flowing. In such an event, the CONTRACTOR shall notify the COMPANY immediately.
Èç¹ûͻȻÓöµ½¸ßѹµØ²ã»ò¾®Ó¿¼£Ïó£¬×ê¾®³Ð°üÉ̸ù¾Ý¹«Ë¾µÄ¾®¿Ø³ÌÐòѸËÙ²ÉȡԤ·À´ëÊ©£¬²¢Á¢¼´Í¨Öª¹«Ë¾¡£
To ensure that the well is kept full of drilling fluid at all times during tripping and measure accurately the hole fill according to good oilfield practices.
¸ù¾Ý±ê×¼µÄÓÍÌï¹ßÀý£¬×ê¾®³Ð°üÉÌӦȷ±£ÆðÏÂ×êʱ¾®ÑÛʼÖÕ³äÂúÄཬ²¢¾«È·²âËã¾®ÑÛÄཬÌî³äÁ¿¡£
To install, test and operate, unless instructed otherwise in writing, Blow Out prevention equipment at least in accordance with the Company’s relevant documents stated in Rig specifications , Specification and Drawings, hereof.
³ý·ÇÁíÓÐÊéÃæÖ¸Ê¾£¬×ê¾®³Ð°üÉÌÆðÂëÓ¦°´ÕÕ×ê»ú¹æ·¶ÖÐÏà¹ØµÄ¹«Ë¾Îļþ¡¢·ÀÅçÉ豸µÄ¼¼Êõ¹æ·¶ºÍͼֽ½øÐа²×°¡¢²âÊԺͲÙ×÷·ÀÅçÆ÷¡£
To test and report same on Blow Out Preventer Control Unit in accordance with the Specifications and Standards included in rig Specifications part and Drawings, hereof.
¸ù¾Ý×ê»ú˵Ã÷ÊéºÍͼֽÖеĹ淶ºÍ±ê×¼²âÊÔ·ÀÅçÆ÷¿ØÖÆÔª¼þ²¢Ìá½»²âÊÔ±¨¸æ¡£
Keep the rig level and centered over the well at all times. Should conditions prevail beyond the control of the CONTRACTOR to prevent this, the CONTRACTOR shall suspend operations in accordance with the CONTRACT under the safest possible conditions and inform the COMPANY immediately. The CONTRACTOR shall propose suitable remedial action which shall be subject to the Company’s written approval.
ʼÖÕ±£³Ö×ê»úˮƽ²¢´¦ÓÚ¾®¿ÚÖÐÐÄ״̬¡£Èç¹û³öÏÖʹ³Ð°üÉÌÎÞ·¨±£³Ö×ê»úˮƽ²¢´¦ÓÚ¾®¿ÚÖÐÐĵÄÇé¿ö£¬¸ù¾ÝºÏͬ£¬×ê¾®³Ð°üÉÌÓ¦°´ÕÕ×î¿ÉÄܰ²È«µÄ×´¿öÁ¢¼´Í£Ö¹Ê©¹¤²¢Í¨Öª¹«Ë¾¡£×ê¾®³Ð°üÉ̶ԴËÌá³öµÄ²¹¾È´ëÊ©±ØÐë»ñµÃ¹«Ë¾µÄÊéÃæÅú×¼¡£
Provide the drilling related services included in the specifications on a continuous or call off basis as described within the CONTRACT.
ÈçºÏͬÖÐÃèÊö£¬Á¬ÐøµØ»ò¼ä¶ÏµØÌṩ¹æ·¶ÄÚÓë×ê¾®Ïà¹ØµÄ·þÎñ¡£
Transport the Company’s and the Company’s sub contractors equipment and materials from its Area Base to the site(s), between site(s) and back with the stand by truck available on site.
ÔÚ¾®³¡×¼±¸Ò»Á¾¿¨³µ´¦ÓÚ´ýÃü״̬£¬ÓÃÓڰѹ«Ë¾ºÍ¹«Ë¾·Ö°üÉ̵ÄÉ豸ºÍ²ÄÁÏ´Ó¹«Ë¾»ùµØÔËË͵½¾®³¡¡¢´Óijһ¾®³¡ÔËË͵½ÁíÒ»¾®³¡»ò´Ó¾®³¡Ô˻ع«Ë¾»ùµØ¡£
To assist the Company’s other Contractor's in performing the work at the Site.
ÏÖ³¡ÐÖú¹«Ë¾µÄÆäËû³Ð°üÉÌÍê³É¹¤×÷¡£
D.Operation of the CONTRACTOR's Equipment:×ê¾®³Ð°üÉÌÉ豸µÄÔËÐУº
The CONTRACTOR shall have the right to select the equipment and/or operating parameters with regard its own equipment.
×ê¾®³Ð°üÉÌÓÐȨ¶Ô×Ô¼ºµÄÉ豸ѡÔñÔËÐÐÉ豸ºÍÔËÐвÎÊý¡£
E.Actions Prior to Commencement Date and after Completion:¿ª×êǰºÍÍê¾®ºóµÄ¹¤×÷
1 Mobilization.¶¯Ç¨
The CONTRACTOR shall undertake to meet the requirements of the Commencement Date which shall include all necessary actions mobilizing the Contractor’s Personnel and the Contractor’s items required to perform the WORK in accordance with the CONTRACT.
ΪÁËÂú×㿪¹¤ÒªÇó£¬×ê¾®³Ð°üÉÌÓ¦×ÅÊÖ´ÓÊ£¬°üÀ¨¶¯Ç¨Ê©¹¤ËùÐèÈËÔ±¡¢É豸µÄËùÓбØÐèµÄ¹¤×÷¡£
2 DemobilizationDz·µ
Upon Termination of the CONTRACT, the CONTRACTOR will demobilize the Contractor’s items and Personnel from the Site in the most expeditious manner in accordance with the CONTRACT.
ºÏͬһ½áÊø£¬¸ù¾ÝºÏͬ×ê¾®³Ð°üÉÌӦѸËÙ½«ÆäÈËÔ±ºÍÉ豸´ÓÏÖ³¡Ç²·µ¡£
F.Availability:¿ÉÓÃÐÔ
The ability to perform well drilling operations shall be continuously available throughout the duration of the CONTRACT. The equipment will be specified in the part of COMPANY and CONTRACTOR shall be continuously available throughout the duration of the CONTRACT.
ÔÚÕû¸öºÏͬÆÚ¼ä£¬×ê»úӦʼÖÕÓÐÁ¬Ðø×꾮ʩ¹¤µÄÄÜÁ¦£¬ºÏͬÖй涨µÄÉ豸ӦÄÜÁ¬ÐøÔËÐС£
G.Acceptance:½ÓÊÜ
The CONTRACTOR shall perform the WORK in accordance with the parameters specified in the program, as is subject to acceptance by the COMPANY.
×ê¾®³Ð°üÉÌÓ¦¸ù¾Ý³ÌÐòÖÐÖ¸¶¨µÄ²ÎÊýÊ©¹¤£¬µ«ÒªµÃµ½¹«Ë¾ÈϿɡ£
The CONTRACTOR shall maintain written records of the values of the parameters mentioned. These records shall be submitted to the COMPANY for signature of the COMPANY REPRESENTATIVE; such signature shall confirm that values fulfilled the requirements of the program.
×ê¾®³Ð°üÉÌÓ¦×öºÃÉÏÊö²ÎÊýµÄ¼Ç¼£¬½«ÕâЩ¼Ç¼Ìá½»¸ø¹«Ë¾´ú±íÇ©×ÖÒÔÈ·Èϰ´ÒªÇóÂÄÐÐÁË×ê¾®³ÌÐò¡£
This documented, signed acceptance of fulfillment by the Company’s REPRESENTATIVE will be recorded at a frequency which is adequate for realistic control of the parameter in question, and will be a necessary element of supporting documentation for payment of invoices.
Óɹ«Ë¾´ú±íÇ©×ÖÈ·ÈϵÄÒÔÉÏÎļþÓ¦°´Ò»¶¨µÄƵ¶ÈµÇ¼Ç£¬µÇ¼ÇµÄƵ¶ÈÓ¦×ãÒÔ¿ØÖÆÉÏÊö²ÎÊý¡£Ç©×ÖÈ·ÈϵļǼҲÊÇ·¢Æ±Ö§¸¶±ØÐëµÄÖ§³ÖÐÔÎļþ¡£
H.Tests Requirements: ²âÊÔÒªÇó
1. Pressure Tests
ÊÔѹ
The minimum acceptable test pressure shall be applied for at least 15 minutes. Pressure drop over this period shall be 10% of the initial pressure, provided that the pressure remains constant for the last 10 minutes.min.
ÔڿɽÓÊܵÄ×îС²âÊÔѹÁ¦ÏÂÊÔѹÖÁÉÙ³ÖÐø15·ÖÖÓ£¬ÔÚ²âÊÔÆÚ¼äÄÚѹÁ¦½µ²»Äܳ¬¹ý×î³õ²âÊÔѹÁ¦µÄ10%£¬µ«¹æ¶¨£¬ÔÚ×îºóµÄ10·ÖÖÓÄÚѹÁ¦±£³ÖÎȶ¨¡£
All pressure tests are to be recorded on pressure charts. A record is to be kept of the volume required to obtain the test pressure, and of the volume returned, when bleeding off.
ËùÓеÄѹÁ¦²âÊÔ¶¼¼Ç¼ÔÚѹÁ¦Í¼±íÉÏ¡£¼Ç¼»ñµÃ²âÊÔѹÁ¦ËùÐèÒªµÄÁ÷ÌåÌå»ý£¬ÒÔ¼°Ð¹Ñ¹Ê±·µ³öµÄÁ÷ÌåÌå»ý¡£
2.BOP Tests·â¾®Æ÷ÊÔѹ
Pressure tests on blow out preventers, wellhead components and their connections shall be made with water through the kill line, using a plug type tester. One of the wellhead side outlets below the plug type tester shall be open to avoid pressurizing the casing. All valves shall be closed immediately after the test. Pressure test to be performed in an efficient manner, combining tests by testing TDS and BOP simultaneously. All time spend repairing contractor equipment after the initial test to obtain a good test is considered repair time. Contractor responsible for running the correct test tool for the wellhead in use as instructed by Company.
ʹÓöÂÈûÆ÷ͨ¹ýѹ¾®¹ÜÏßעˮ¶Ô·ÀÅçÆ÷¡¢¾®¿Ú×°Öü°ÆäÁ¬½Ó²¿·Ö½øÐÐѹÁ¦²âÊÔ¡£ÊÔѹ¶ÂÈûÆ÷ϲ¿¾®¿Ú²à·½µÄÒ»³ö¿ÚÓ¦³¨¿ªÒÔ±ÜÃâÌ×¹ÜÊÜѹ¡£ÊÔѹ½áÊøºó£¬Á¢¼´¹Ø±ÕËùÓеķ§ÃÅ¡£ÊÔѹʱ°Ñ¶¥ÇýϵͳºÍ·ÀÅçÆ÷ÁªºÏͬʱ½øÐУ¬ÒÔ±ã¸ßЧ¿ìËÙÍê³É¡£Ê×´ÎÊÔѹ²¢»ñµÃÁ¼ºÃµÄ½á¹ûºó£¬ËùÓÐÓÃÓÚÐÞÀí×ê¾®³Ð°üÉÌÉ豸µÄʱ¼äÊÓÐÞÀíʱ¼ä¡£°´ÕÕ¹«Ë¾Ö¸Á×ê¾®³Ð°üÉ̸ºÔðÕýȷʹÓþ®¿ÚÊÔѹ¹¤¾ß¡£
A cup type tester will only be used for those tests which cannot be performed with a plug type tester. The drill pipe shall also be strong enough to withstand the tensile load caused by the hydraulic pressure on the cup area. To avoid collapse of the casing in case of leaks, volumes pumped shall be monitored carefully.
ƤÍëʽÊÔѹÆ÷½öÊÊÓÃÓÚ²»ÄÜÓöÂÈûÆ÷½øÐеÄÊÔѹ¡£×ê¸ËÓ¦ÄܳÐÊÜסÓÉÓÚÆ¤Í벿·Ö³ÐÊÜҺѹÔì³ÉµÄÕÅÁ¦¸ººÉ¡£ÎªÁ˱ÜÃâй©Ëð»µÌ׹ܣ¬Ó¦×Ðϸ¹Û²ì±ÃÈëÊÔѹÁ÷ÌåµÄÌå»ý¡£
Blind Rams shall be pressure tested with the plug type tester converted into a blind plug, or against a landed tubing hanger with a two way control valve installed. Blind rams test against cemented casing are normally not allowed.
È«·âÕ¢°åÊÔѹʱҪ°Ñ»î¶ÂÈûÊÔѹÆ÷ת»»³ÉäÈûÊÔѹÆ÷»òÕßÀûÓÃÒѾ°²×°µÄ´øÓÐË«Ïò¿ØÖÆ·§µÄÓ͹ÜÐü¹ÒÆ÷À´½øÐС£Í¨³£²»ÔÊÐíÓÃÈ«·âÕ¢°å¶ÔÒѹ̺õÄÌ׹ܽøÐÐÊÔѹ¡£
The choke manifold, valves, kill and choke lines and valves on the side outlets shall be pressure tested with water to a working pressure of the ram type preventers/casing spool. The equipment shall hold the pressure applied for at least 15 minutes.
¶Ô½ÚÁ÷¹Ü»ã¡¢·§ÃÅ¡¢Ñ¹¾®¹ÜÏß¡¢²à³ö¿ÚÉϵķ§ÃÅÊÔѹ£¬Ó¦ÓÃË®ÊÔѹµ½Õ¢°åÐÍ·â¾®Æ÷»òÌ׹ܷÀÅç·¨À¼¶Ì½ÓµÄ¹¤×÷ѹÁ¦¡£É豸ÔÚ³Ðѹ״̬ÏÂÖÁÉÙ±£³Ö15·ÖÖÓ¡£
All lines shall be flushed prior to the test to ensure they are not blocked.
ÊÔѹǰ³åÏ´ËùÓеĹÜÏßÒÔÈ·±£³©Í¨¡£
No tests shall be performed against closed chokes.²»ÄܶԷâ±ÕµÄ½ÚÁ÷¹ÜÏß½øÐÐÊÔѹ¡£
The Kelly IBOP and Kelly cocks safety valves & TDS valves shall be pressure tested to their working pressure with a test sub from below. Standpipe manifold should be pressure tested to 1.2 relief valve of setting for that particular hole section to a maximum of 5000 psi.
·½×ê¸ËÄÚ·ÀÅçÆ÷¡¢·½×ê¸ËÐýÈû°²È«·§ÒÔ¼°¶¥Çýϵͳ·§ÃŵÄÊÔѹ£¬ÓÃÏ·½µÄÊÔѹ¶Ì½ÓÊÔѹµ½Æä¹¤×÷ѹÁ¦ÎªÖ¹¡£Á¢¹Ü¹Ü»ãµÄÊÔѹ£¬Ó¦ÊÔѹµ½ÎªÄ³Ò»ÌØÊâ¾®¶Î°²·ÅµÄ°²È«·§¹¤×÷ѹÁ¦µÄ1.2±¶£¬×î¸ß²»³¬¹ý5000psi¡£
Bonnet seals shall be pressure tested after ram changes. All broken connections of any pressure part of HP equipment should be pressure tested to the SWP after repair.
¸ü»»Õ¢°åºóÓ¦¶Ô·§¸ÇÃÜ·â»·½øÐÐѹÁ¦²âÊÔ¡£ËùÓиßѹÉ豸³Ðѹ²¿·ÖµÄÁ¬½Ó´¦Ëð»µÐÞÀíºó£¬Ó¦ÊÔѹµ½ÏµÍ³µÄ¹¤×÷ѹÁ¦¡£
I.Location:ÏÖ³¡
1 General×ÜÔò
The CONTRACTOR shall ensure that all accommodation units on the drilling site are all connected to the soak-away. The central camp facilities shall be connected to a septic tank or a soak away pit, as determined and furnished by Company.
×ê¾®³Ð°üÉÌÈ·±£ÏÖ³¡ËùÓÐÓª·¿µÄÏÂË®µÀͨµ½»¯·à³Ø¡£ÖÐÐÄÓª·¿ÉèʩҲͨ¹ýÏÂË®µÀÁ¬½Óµ½»¯·à³Ø£¬¸Ã»¯·à³ØµÄλÖᢳߴçÓɹ«Ë¾¾ö¶¨²¢Ìṩ¡£
The CONTRACTOR shall maintain the level of water, mud, sand, etc., sufficiently low to provide access to the wellhead. The CONTRACTOR shall empty at the end of the well operations to below the level of the lowest Casing Head Housing.
×ê¾®³Ð°üÉÌӦʹ·½¾®ÖÐË®¡¢Äཬ¡¢É³µÈÎïÃæµÄ¸ß¶È±£³Ö×ã¹»µÄµÍÒÔ±ãÔÚ¾®¿ÚÊ©¹¤¡£Ã¿¿Ú¾®Ê©¹¤Íê±Ïºó£¬³Ð°üÉÌӦʹ·½¾®ÄÚÎïÃæµÍÓÚ×îµÍÌ×¹ÜÍ·µÄ¸ß¶È¡£
Position of the Kelly and single holes shall be determined by the CONTRACTOR and shall not interfere with access to the wellhead or cellar.
·½×ê¸Ë¼°Êó¶´µÄλÖÃÓÉ×ê¾®³Ð°üÉ̾ö¶¨£¬µ«²»ÄÜÓ°Ïì½ø³öÈë¾®¿Ú»ò·½¾®¡£
The CONTRACTOR shall manage the operation of the two pits provided for collection and storage of cuttings, mud and water. The waste pit is intended for collection of cuttings and waste mud, the "water" storage pit is intended to store water (for combating lost circulation, if required).
×ê¾®³Ð°üÉ̸ºÔðË®³Ø¼°ÎÛÎï³ØµÄʹÓùÜÀí¡£ÎÛÎï³ØÓÃÓÚÊ¢·ÅÑÒм¡¢·ÏÄཬ£»Ë®³ØÓÃÓÚ´¢´æË®£¨ÐèҪʱ£¬ÓÃÓڶ©£©¡£
If location was built by CONTRACTOR the cuttings/waste pit shall, after drying, be filled and leveled with a minimum layer of 0.3 meters of clean soil/sand.
Èç¹ûÏÖ³¡ÓÉ×ê¾®³Ð°üÉÌÐÞ½¨£¬ÎÛÎï³Ø¸ÉºÔºó£¬Óøɾ»É³ÍÁÌîÆ½£¬¾»ÍÁµÄºñ¶ÈÖÁÉÙ30ÀåÃס£
If location was built by CONTRACTOR the water pit shall be dried and, in the case of an abandoned well, be filled with soil/sand and leveled. If the well is suspended the water pit shall be restored dried and cleaned.
Èç¹ûÏÖ³¡ÓÉ×ê¾®³Ð°üÉÌÐÞ½¨£¬ÈçËù×꾮ΪÆú¾®£¬Ë®³Ø¸ÉºÔºóÓÃɳÍÁÌîÆ½£¬²¢°ÑµØÃæÕûƽ¡£ÈçËù×ê¾®ÔÝͣʩ¹¤£¬Ë®³Ø¸ÉºÔºóÇåÀí¸É¾»Ê¹Æä»Ö¸´Ô×´¡£
K.Campsite:Óª·¿
If location was built by CONTRACTOR at the Campsite the CONTRACTOR shall construct and maintain a sewerage pit which shall be used by the CONTRACTOR to dispose of waste water and sewage. The sewage pit shall be adequately sized to collect all sewage and waste water thereby preventing the possibility of pollution to the local environment.
Èç¹ûÏÖ³¡ÓÉ×ê¾®³Ð°üÉÌÐÞ½¨£¬×ê¾®³Ð°üÉÌÔÚÓª·¿³¡µØÓ¦ÐÞ½¨Ò»ÎÛË®³Ø£¬ÓÃÓÚ´¦ÀíÎÛË®¡¢·ÏË®¡£ÎÛË®³ØÓ¦×ã¹»´ó£¬ÒÔ·ÀÎÛË®¡¢·ÏË®Òç³öÎÛȾÖÜΧµÄ»·¾³¡£
The CONTRACTOR shall provide adequate lighting between living units and along walkways.
ΪӪ·¿ÇøÌṩ×ã¹»µÄÕÕÃ÷¡£
The CONTRACTOR shall provide a container for domestic waste disposal.
×ê¾®³Ð°üÉÌÓ¦ÌṩһÀ¬»øÍ°ÒÔÊ¢·ÅÉú»îÀ¬»ø¡£
If location was built by CONTRACTOR then at termination/completion of operations the CONTRACTOR shall clean the campsite of all CONTRACTOR generated debris and waste and close all pits to the satisfaction of the COMPANY REPRESENTATIVE and in line with Company’s location acceptance standard provided such closure can be performed with Rig contract equipment.
Èç¹ûÏÖ³¡ÓÉ×ê¾®³Ð°üÉÌÐÞ½¨£¬Ê©¹¤½áÊøºó£¬×ê¾®³Ð°üÉÌÀûÓÃÆäÉ豸ÇåÀíÓª·¿ÏÖ³¡µÄË鯬¡¢À¬»ø¡¢·ÏÎÌîÆ½ËùÓеÄÎÛÎï³Ø£¬Ê¹¹«Ë¾´ú±íÂúÒ⣬´ïµ½¹«Ë¾ÈϿɵÄÏÖ³¡±ê×¼¡£
L.Emergency Procedures:Ó¦¼±³ÌÐò
The CONTRACTOR shall conduct, record and report to the COMPANY REPRESENTATIVE following each kick drill which shall be either, one pit drill or one swab drill whilst tripping (undertaken by each shift) and a fire drill. Each exercise shall be undertaken every week or more, dependent on local legislation, or as required by the COMPANY REPRESENTATIVE.
×ê¾®³Ð°üÉ̸ù¾Ýµ±µØ·¨¹æ»ò¹«Ë¾´ú±íµÄÒªÇó£¬Ã¿ÖÜÖÁÉÙ½øÐÐÒ»´Î·À»ðÑÝϰºÍÕë¶Ô×ê½øÊ±Äà½¬ÒºÃæÉý¸ß·¢ÉúµÄ¾®Ó¿Çé¿ö»òÆð×êʱÓÉÓÚÄཬÖùѹÁ¦½µµÍÔì³ÉµÄ¾®Ó¿Çé¿ö½øÐзÀÅçÑÝϰ£¨Ã¿°à¸÷½øÐÐÒ»´Î£©£¬×öºÃÑÝϰ¼Ç¼²¢Ïò¹«Ë¾´ú±í»ã±¨¡£
The CONTRACTOR shall also:×ê¾®³Ð°üÉÌÒàÓ¦£º
1.Adhere to the Company’s emergency procedures which shall include evacuation from the drilling location.
×ñÊØ¹«Ë¾µÄ£¬°üÀ¨´Ó¾®³¡³·ÀëµÄ¸÷ÏîÓ¦¼±³ÌÐò¡£
2.Have emergency procedures for the evacuation of their Personnel and their Personnel's dependents.
¾ßÓй¤×÷ÈËÔ±¼°Æä¼ÒÊôÈËÔ±µÄ³·ÀëÓ¦¼±³ÌÐò¡£
3.Have procedures for the treatment of any ailments which can occur through the use or misuse of chemicals, gasses and the like.
¾ßÓÐÓÉÓÚʹÓû¯Ñ§Ò©Æ·¡¢¸÷ÖÖÆøÌåµÈ£¬»òʹÓò»µ±Òý·¢µÄÈκβ»Á¼·´Ó¦µÄÓ¦¼±´¦Àí³ÌÐò¡£