10.0 TEMPORARY WORKSÁÙʱ¹¤³Ì
Plant, tools, etc. and scaffolding»úе¡¢Æ÷¾ß¡¢½ÅÊÖ¼Ü
Provide and maintain in good working order all mechanical equipment, plant, tools, implements, ladders, tarpaulins and the like necessary for the proper and timely execution and protection of the Works. No wooden “home made” ladders, trestles or saw benches shall be permitted on the site.
×ܰü·½ÐëÌṩ²¢Î¬»¤ºÃΪ±£Ö¤Õý³£ºÍ°´Ê±Ê©¹¤ÒÔ¼°¶Ô¹¤³Ì½øÐб£»¤ËùÐèµÄ»úеװÖá¢É豸¡¢¹¤¾ß¡¢Æ÷е¡¢ÌÝ×Ó¡¢·ÀË®ÓͲ¼¼°ÆäËû±ØÐëÎïÆ·¡£Ä¾ÖƼÒÓÃÌÝ×Ó¡¢ÅÀÌÝ»ò¾â´²ÑϽûÔÚÏÖ³¡Ê¹Óá£
Provide, erect, alter if necessary and maintain all necessary scaffolding to the satisfaction of Symantec and remove on completion and make good all work disturbed.
ÐëÌṩ¡¢¼ÜÉè¡¢ÔÚÐèҪʱ¸Ä¶¯¼°Î¬ÐÞÒ»ÇбØÐèµÄ²¢ÇÒÁî ÂúÒâµÄ½ÅÊּܣ¬²¢ÔÚ²»ÔÙÐèҪʱ²ð³ý£¬Í¬Ê±ÐëÐÞ²¹ËùÓÐÊܵ½Ó°ÏìµÄ¹¤×÷¡£
The General Contractor will not be permitted to take support from windows for erecting scaffolding or plant. The method of securing the scaffolding and plant shall be to the Jianli’s approval.
×ܰü·½²»µÃÒÔ´°»§×÷Ϊ֧³Åµã¼ÜÉè½ÅÊּܻòÉ豸¡£½ÅÊּܺÍÉ豸µÄ¼ÜÉè·½·¨Ðë¾¼àÀíͬÒâ¡£
The maintenance of all plant shall be undertaken outside normal working hours and the General Contractor shall provide sufficient reserve plant of all kinds to ensure that the work is not interrupted by breakdown of plant.
ËùÓлúеºÍÉ豸µÄά»¤ºÍ±£ÑøÐëÔÚÕý³£¹¤×÷ʱ¼ä·¶Î§Íâ½øÐУ¬×ܰü·½ÐëÌṩ×ã¹»µÄ¸÷À౸ÓûúеºÍÉ豸£¬È·±£¹¤³Ì²»»áÒò»úеºÍÉ豸µÄ¹ÊÕ϶øÍ£¶Ù¡£
The GC shall erect and maintain suitable and safe ladders and gangways for the all workers, staff and visitors to the site and shall provide access to Symantec and to Symantec’s Representatives to thoroughly inspect any portion of the Works on the request of the Project Manger and ensure with complete safety when doing so.
×ܰü·½Ðë¼ÜÉ貢ά»¤Êʵ±µÄ°²È«ÌݺÍÌø°åʹµÃËùÓй¤ÈË¡¢Ô±¹¤ºÍÀ´·ÃÕßÄܹ»½øÈëÏÖ³¡£¬ÒÔ¼°xxxx¼°Æä´ú±í¸ù¾ÝÏîÄ¿¾ÀíµÄÒªÇó¿ÉÒÔ¾ø¶Ô°²È«µØ¶Ô¹¤³ÌµÄÈκβ¿·Ý½øÐг¹µ×¼ì²é¡£
General Contractor's storage sheds, workshops and office
×ܰü·½µÄ²Ö¿â¡¢¹¤×÷¼ä¡¢ºÍ°ì¹«ÊÒ
The General Contractor shall provide for his own use all necessary workshops, mess rooms, offices and sheds of suitable construction for the storage of materials, maintain them in good order to the satisfaction of Symantec, remove on completion of the Works and make good the sites.
×ܰü·½ÐëÔÚxxxxÂúÒâµÄÇé¿öÏÂÌṩ²¢ÇÒά»¤ºÃÒ»ÇÐ×Ô¼º±ØÐèµÄ¼Ó¹¤³µ¼ä¡¢ÔÓÎï·¿¡¢°ì¹«ÊÒºÍÎïÁÏ´¢´æ²Ö¿â£¬²¢ÔÚ¹¤³ÌÍ깤ʱ²ð³ýÒÔ¼°½«³¡µØ»Ö¸´¡£
The materials may be properly stored in completed sections of the Works provided that no section of the structure is loaded in excess of the design loading and no hindrance is caused to the progress of the Works or access thereto or to partial completion of Works where this is required.
ÎïÁÏ¿ÉÒÔ´¢´æÔÚÍ깤µÄ¹¤³Ì¶ÎÄÚ£¬µ«ÖØÁ¿²»µÃ³¬¹ý¸Ã¶Î½á¹¹µÄÉè¼ÆºÉÔØ£¬²¢ÇÒ²»µÃ¶Ô¹¤³ÌµÄÕý³£½øÐкͳöÈëͨµÀ£¬»ò¶ÔËùÒªÇ󲿷ÖÍ깤µÄ¹¤³Ì²úÉú·Á°¡£
All materials on the site and in the building shall be stored in a proper, neat and orderly manner.
ËùÓÐÏÖ³¡ºÍ½¨ÖþÎïÄÚµÄÎïÁϱØÐëÕûÆë°Ú·Å¡£
Separate inflammable goods storage sheds must be provided in an approved location. No inflammable goods such as oil based paints, kerosene, thinners, cellulose lacquers, bitumen or bitumen based products etc. will be permitted to be stored in the building under construction.
Ò×ȼÎïÆ·Öü²Ø¿â±ØÐëµ¥¶À½¨ÔÚÐí¿ÉµÄµØÇø¡£ËùÓÐÒ×ȼÎïÖîÈçÓÍÆá¡¢ÃºÓÍ¡¢Ï¡ÊͼÁ¡¢Ïõ»¯ÏËάÇåÆá¡¢Á¤Çà»òÁ¤ÇàÀà²úÆ·µÈ²»µÃÖü´æÔÚÕýÔÚ½øÐн¨ÔìºÍÊ©¹¤µÄ½¨ÖþÎïÖС£
No combustible materials should be allowed to build up on the site and should be regularly removed from site in full compliance with the LEED Contractor’s Package.
ÏÖ³¡ÑϽû¶Ñ»ýÒ×ȼ²ÄÁÏ£¬²¢Ó¦°´ÕÕLEEDרҵÎļþµÄÒªÇó½øÐж¨ÆÚÇåÀí¡£
Office for Symantec and Symantec’s Representatives, etc.
¼°Æä´ú±íµÈµÄ°ì¹«ÊÒ
The GC shall supply temporary site accommodation for all contractors on the site including the JianLi staff on site.
×ܰü·½ÐèÒªÏòÏÖ³¡ËùÓгаü·½¼°¼àÀíÈËÔ±ÌṩÏÖ³¡ÁÙʱ°ì¹«ÊÒ¡£
In addition, the GC shall provide Symantec and their representatives with the following fully services offices :-
ÁíÍ⣬×ܰü·½Ó¦Ïòxxxx¼°Æä´ú±íÌṩ°ì¹«ÊÒÒÔ¼°ÒÔÏÂÈ«²¿ÉèÊ©£º
A project manager’s office.¡¡¡¡Ò»¸öÏîÄ¿¾Àí°ì¹«ÊÒ
An engineers office for 5 engineers¡¡¡¡Ò»¸ö¿ÉÈÝÄÉ5Ãû¹¤³ÌʦµÄ¹¤³Ìʦ°ì¹«ÊÒ
A meeting room for 6 with a white board.¡¡¡¡Ò»¸ö6ÈË»áÒéÊÒ°üÀ¨°×°å
Independent toilets – one male and one female.¡¡¶ÀÁ¢²ÞËù£Ò»¸öÄв޺ÍÅ®²Þ
Independent fully serviced pantry.¡¡¶ÀÁ¢²èË®¼ä°üÀ¨È«²¿ÉèÊ©
Each office shall be supplied with a suitable number of desks, chairs, filing cabinets, and cupboards, telephones (a minimum two telephone lines and internet connections for 6 staff). All offices shall be well lit with heating and cooling. All doors shall be lockable in a secure fashion. The following list outlines the facilities required and shall include for replacement as indicated (RR-allow for replacements as necessary).
ÿ¸ö°ì¹«ÊÒÓ¦ÌṩºÏÀíÊýÁ¿µÄ×À×Ó¡¢ÒÎ×Ó¡¢Îļþ¹ñºĮ́×Ó¡¢µç»°£¨ÖÁÉÙÁ½Ìõµç»°Ïߺ͹©6ÃûÔ±¹¤Ê¹ÓõĻ¥ÁªÍøÁ¬½Ó£©¡£ËùÓа칫ÊÒÓ¦¾ßÓÐ×ã¹»ÕÕÃ÷¼°Àäůµ÷½Ú¡£ËùÓÐÃÅÓ¦Óа²È«µÄÃÅËø¡£Ï±í´óÖÂÁгöÁËÐèÒªµÄÉèÊ©£¬²¢ÔÚÌá³öµÄʱºò¿ÉÒÔ½øÐиü»»£¨RR £ ±ØÒªÊ±ÔÊÐí¸ü»»£©¡£
The GC shall provide adequate and daily cleaning toilets for all operatives on the site for the use of the contractors’ personnel. The General contractor shall maintain efficient and sanitary latrine accommodation for the use of male and female labour employed on the Works and keep the whole of the site and buildings in a clean and sanitary condition to the satisfaction of Symantec and in full compliance with LEED.
×ܰü·½Ó¦ÔÚÏÖ³¡Ìṩ×ã¹»²ÞËù¼°±£Ö¤ÈÕ³£Çå½à¹©³Ð°ü·½ÈËԱʹÓá£×ܳаü·½ÐëÔÚxxxxÂúÒâµÄÇé¿öÏÂά»¤¹©ÄÐÅ®¹¤ÈËʹÓõÄÓÐЧÎÀÉú²ÞËùÉèÊ©£¬Ê¹Õû¸ö¹¤µØºÍ½¨ÖþÎï±£³ÖÇå½àÎÀÉúͬʱÐë·ûºÏLEEDµÄÒªÇó¡£
Positions of all site offices, temporary latrines, sheds, hoists and the like
ÏÖ³¡°ì¹«ÊÒ£¬ÁÙʱ²ÞËù£¬¹¤ÅÉý½µ»ú¼°ÀàËÆÉèʩλÖÃ
(1) Submit to Symantec through Symantec’s Project Manger for approval proposals for the positions of all site access points, guard houses, offices, temporary latrines, sheds, hoists and the like. After receiving approval from Symantec, submit the proposals with the required Form to the relevant Authorities for approval.
ͨ¹ýxxxxµÄÏîÄ¿¹ÜÀí¹«Ë¾Ïòxxxx±¨ÅúËùÓ餵ØÏÖ³¡³öÈë¿Ú¡¢¾¯ÎÀÊÒ¡¢°ì¹«ÊÒ¡¢ÁÙʱ²ÞËù¡¢¹¤Åï¡¢ÆðÖØ»úµÈµÄλÖá£Ôڵõ½xxxxµÄÅú×¼ºó£¬°´Õչ涨µÄ·½Ê½Ïòµ±µØÏà¹Ø²¿Ãű¨Åú¡£
(2) The General Contractor must comply fully with CDHT’s conditions for contractors regarding but not limited to:-
×ܰü·½±ØÐëÍêÈ«×ñÊØ³É¶¼¸ßÐÂÇø¾Í³Ð°üÉÌÒÔϸ÷Ïµ«²»½ö½ö¾ÖÏÞÓÚ´Ë£©µÄ¹æ¶¨¡£
The General Contractor should allow for all temporary works and utilities in a safe fashion to the satisfaction of the Local Authorities, Symantec and Symantec’s Representatives.
×ܰü·½Ðë±£Ö¤Áîµ±µØÓйز¿ÃÅ¡¢xxxx¼°Æä´ú±í¶ÔËùÓеÄÁÙʱ¹¤³ÌºÍÉèÊ©µÄ°²È«¸Ðµ½ÂúÒâ¡£
Temporary supportsÁÙʱ֧³Å
Allow here, unless measured or itemized elsewhere in these Bill of Quantities, for all necessary temporary supports including, inter alia, shoring, propping, strutting, planking and strutting, sheet piling, etc. whether for the support of excavation, new work under construction or of existing buildings and existing slopes. All such temporary supports shall be designed by the General Contractor to the approval of the LDI and the Local Authorities. The General Contractor shall be responsible for its safety throughout the period of the Works and no indication of approval or disapproval of such temporary supports by Symantec or any of the Symantec’s representatives shall be interpreted as in any way reducing the General Contractor's responsibility in this respect. Should Symantec in lieu of the General Contractor subsequently undertake to provide drawings detailing the requirements for temporary supports and should Symantec obtain the approval of the Authority to these proposals, then the General Contractor shall construct the temporary supports in accordance with such drawings at no extra cost, as if they were his own design.
³ýÁËÔÚµ¥¼Û±íÀïÁíÓмÇÔØºÍ²âÁ¿µÄ£¬×ܰü·½ÐëÌṩ°üÀ¨Ð±³Å¡¢¶¥³Å¼°Ö§³Å¡¢¼Ó¹Ì¡¢°å×®µÈÔÚÄÚµÄÎÞÂÛÊÇÓÃÓÚ¿ªÍÚÖ§³Å»¹ÊÊÓÃÔÚ½øÐÐÖеŤ³Ì»òÏÖÓн¨ÖþÎPбÆÂËùÐèµÄÒ»ÇÐÁÙʱ֧³Å¡£ËùÓÐб³Å¡¢¶¥³Å¼°Ö§³ÅµÈÐëÓÉ×ܰü·½½øÐÐÉè¼Æ²¢½»Éè¼ÆÔº¼°Óйز¿ÃÅÈϿɡ£ÔÚÕû¸ö¹¤³ÌÖÐ×ܳаü·½Ðë¶ÔÉÏÊöÉèÊ©µÄ°²È«¸ºÔð£¬xxxx¶ÔÁÙʱ¹¤³ÌµÄÈÏ¿ÉÓë·ñ¶¼²»»áÃâ³ý×ܰü·½µÄÔðÈΡ£xxxx¿É·¢³öͼֽ˵Ã÷ÆäÒªÇ󣬶ø×ܰü·½Ðë°´¸ÃµÈͼֽ¼ÜÉèб³Å¡¢¶¥³Å¼°Ö§³ÅµÈ£¬²»µÃÊÕÈ¡¶îÍâ·ÑÓã¬ÕýÈçͬËûÃÇ×Ô¼ºµÄÉè¼ÆÒ»Ñù¡£
Provide telephones on the site for use also by all Contractors and others legitimately employed people on the site including paying all charges and removing on completion.
×ܰü·½ÐëÔÚ¹¤µØÄÚÌṩµç»°£¬¹©ËùÓгаü·½ÒÔ¼°ÆäËûºÏ·¨¹ÍÓõÄÏÖ³¡ÈËÔ±µÈʹÓ㬲¢ÐëÖ§¸¶ËùÓеķÑÓü°ÔÚÍ깤ºó²ð³ý¡£
Water for the Works¹¤µØÓÃË®
Provide and distribute all necessary temporary water at the Site for the carrying out of the Works, including the works for all contractors and the Public Utility Companies including the erection and removal of temporary plumbing and storage and the payment of all fees and charges.
¶ÔÊ©¹¤ÇøÓòÄÚÌṩ²¢ÊäËͱ¾¹¤³ÌËùÐèµÄÊ©¹¤ÓÃË®£¬°üÀ¨ËùÓгаü·½¡¢xxxxµÄÖ±½Ó³Ð°üÉ̵Ť³ÌÒÔ¼°¹«ÓÃÊÂÒµµÈ¹¤³Ì¡£Ê©¹¤ÇøÓòÄÚ¹ÜÏ߯ÌÉè¼°²ð³ý´¢Ë®ÉèÊ©ÓÉ×ܰü·½¸ºÔð¡£Ê©¹¤ÆÚ¼äµÄÓÃË®·ÑÓÃÓÉ×ܰü·½³Ðµ£¡£
The General Contractor shall provide and distribute water free of charge to all contractors, Symantec direct contractors and public utilities companies.
×ܰü·½ÐëÃâ·Ñ¶ÔËùÓгаü·½¡¢xxxxÖ±½Ó³Ð°ü·½ÒÔ¼°¹«ÓÃÊÂÒµ¹«Ë¾ÌṩºÍÊäËÍÓÃË®¡£
No extension of time will be granted for any delay in obtaining a temporary water supply or for any delay caused by stoppage or interruption of water supply.
¶ÔÒòÍÆ³Ù»ñµÃÁÙʱÓÃË®ÒÔ¼°Ê©¹¤ÆÚ¼äµÄͣˮ¶ø²úÉúµÄÑÓÎ󣬹¤ÆÚ²»»áÒò´Ë¶øÑÓ³¤¡£
Lighting and powerÕÕÃ÷ºÍµçÁ¦
Provide all necessary temporary lighting and power at the Site for the carrying out all of the of the Works including the works of all contractors , direct contractors employed by Symantec and the Public Utility Companies and including all electric power to enable the same to check, test and commission their installations to meet the requirements of all having jurisdiction. A detailed temporary lighting design will be required for approval within 10 days of appointment for approval by and their Project Manger.
¶ÔÊ©¹¤ÇøÓòÄÚÌṩ±¾¹¤³ÌËùÐèµÄÈ«²¿ÕÕÃ÷ºÍÊ©¹¤Óõ磬Ìṩ·¶Î§°üÀ¨³Ð°ü·½µÄ¹¤³Ì¡¢xxxxÖ±½Ó³Ð°ü·½µÄ¹¤³ÌÒÔ¼°¹«ÓÃÊÂÒµµÈ¹¤³Ì¡£Í¬Ê±Ðë¶ÔÒÔÉϸ÷·½ÎªÂú×ã·¢°ü·½ºÍÏà¹ØÈ¨Á¦²¿ÃŵÄÒªÇó½øÐеļì²é¡¢²âÊÔºÍÉ豸µ÷ÊÔÌṩµçÔ´¡£
The General Contractor shall be responsible for all Site works in distributing electricity including, but not limited to, provision, installation and subsequent removal of temporary main switch board, distribution boards, cables, wiring, junction boxes, transformers, lights and all other accessories.
×ܰü·½Ð븺Ôð¶ÔËùÓеÄÏÖ³¡¹¤×÷·ÖÅäÓõ磬°üÀ¨£¨µ«²»¾ÖÏÞÓÚ£©¹©µç¡¢°²×°¡¢ÒÔ¼°Ëæºó²ð³ýÁÙʱµÄµçÕ¢¡¢ÅäµçÏä¡¢µçÀ¡¢µçÏß¡¢·ÖÏߺС¢±äѹÆ÷¡¢ÕÕÃ÷É豸ÒÔ¼°ÆäËûËùÓеÄÅä¼þ¡£
The whole installation is to comply with the latest edition of the regulations for electrical installations and all requirements of the Electricity Supply Company.
×ܰü·½µÄÈ«²¿°²×°Ðë·ûºÏ¹©µç¾Ö×îаæÌõÀýÖеĵçÁ¦°²×°ºÍÆäËüÒªÇó¡£
The General Contractor shall provide and distribute electricity free of charge to all contractors, contractors employed directly by Symantec and the Public Utility Companies.
×ܰü·½ÐëÃâ·Ñ¶ÔËùÓгаü·½¡¢xxxxÖ±½Ó¹ÍÓõijаü·½ÒÔ¼°¹«ÓÃÊÂÒµ¹«Ë¾Ìṩ²¢ÊäËÍÓõ硣
No extension of time will be granted for any delay in obtaining a temporary electricity supply or any for delay caused by stoppage or interruption of power supply.
ÈçÓöÍÆ³ÙÁÙʱ¹©µç¡¢Í£µç»ò¶Ïµç¶øÔì³ÉµÄÈκÎÑÓÎ󣬹¤ÆÚ²»»áÒò´Ë¶øÑÓ³¤¡£
Other temporary worksÆäËûÁÙʱ¹¤³Ì
Provide all other necessary temporary works not specifically mentioned herein.
ÐëÌṩËùÓÐÆäËû±ØÐ赫δÔÚ´ËÌØ±ðÌá¼°Ö®ÁÙʱ¹¤³Ì¡£
11.0 STATUTORY OBLIGATIONS·¨¶¨ÔðÈÎ
Notices, Fees and Charges (See also Conditions of Contract Clause 4)
֪ͨºÍ·ÑÓã¨Í¬Ê±²ÎÕÕºÏͬÌõ¼þ²¿·ÖµÚËĿ
The General Contractor shall comply with and give all notices required by any legislation, ordinance, regulations, byelaw, notice and requirements of Government, Authorities, public utilities companies or any statutory undertaker which has any jurisdiction with regard to the Works or with whose systems the same are or will be connected.
×ܰü·½×ñÊØ²¢°´ÕÕ¹ú¼ÒºÍµØ·½Õþ¸®ÒÔ¼°¶Ô±¾¹¤³ÌÓйÜϽȨ»ò±¾¹¤³ÌÐèÓëÆäϵͳ½Ó²µµÄ¹«ÓÃÊÂÒµµ¥Î»µÄ·¨ÂÉ¡¢·¨¹æ¡¢ÌõÀýºÍÓйع涨£¬ÏòÆäͨ±¨¡£
The General Contractor shall bear the cost of any fees or charges, levies, duties, rates or taxes legally demandable under any legislation or ordinance, regulations, byelaw or notice of Government, Authorities, public utilities companies or any statutory undertaker in respect of the Works other than the cost of the construction of run-ins, reinstatement of paving and connections to main services which where applicable will be the subject of a "Provisional Sum".
×ܰü·½Ðë³Ðµ£Õþ¸®¡¢»ú¹Ø¡¢¹«¹²ÊÂÒµµ¥Î»»ò·¨¶¨¸ºÔðÈ˵ÄÓйط¨ÂÉ¡¢·¨¹æºÍ֪ͨ¹æ¶¨µÄÏà¹ØµÄ¸÷ÖÖ·ÑÓúÍ˰½ð¡£¶ÔÒò¹¹ÖþÁÙʱͨµÀ¡¢»Ö¸´ÆÆËðÂ·Ãæ¡¢ÅäÌ×¹¤³ÌÈë»§Á¬½ÓµÈÒý·¢µÄ·ÑÓý«°´ÔÝÁпÀí¡£
Working hours, rates of wages etc.¹¤×÷ʱ¼ä¡¢¹¤×ʱê×¼
The General Contractor shall comply with any current legislation or regulations regarding working conditions, working hours, or rates of payment to employees, including those required by CDHT .
×ܰü·½Ðë×ñÊØÈκÎÏÖÐз¨ÂÉ¡¢·¨¹æÖй涨µÄ¹¤×÷ʱ¼ä¡¢¹¤×÷Ìõ¼þ¡¢¹¤×ʱê×¼£¬°üÀ¨³É¶¼¸ßÐÂÇøµÄÏà¹Ø¹æ¶¨¡£
Safety precautions and security °²È«·À·¶
The General Contractor shall comply with any legislation, ordinance, regulations, byelaw or notice in connection with safety on Work Sites.
×ܰü·½Ðë×ñÊØËùÓÐÓÚ¹¤µØ°²È«¹ÜÀíÓйصĵķ¨ÂÉ¡¢·¨Áî¡¢¹æ¶¨¡¢µØ·½ÌõÀý»ò֪ͨ¡£
The General Contractor shall provide sufficient safety helmets for the use of Symantec, the consultants and other authorized persons visiting the site.
×ܰü·½ÐëÌṩ×ã¹»ÊýÁ¿µÄ°²È«Ã±¹© ¡¢×Éѯ¹ËÎÊÒÔ¼°ÆäËüÊÚȨ½øÈëÏÖ³¡µÄÈËԱʹÓá£
The General Contractor shall throughout the progress of the Works take full responsibility for the adequate stability and safety of all operations on the Site and have full regard for the safety of all persons on the Site. The General Contractor shall keep the Site and the Works in an orderly state appropriate to the avoidance of danger to all persons.
×ܰü·½ÐëÔÚÈ«²¿Ê©¹¤¹ý³ÌÖжÔÏÖ³¡µÄ°²È«Îȶ¨²Ù×÷¸ºÔð£¬ÍêÈ«¸ºÔðÏÖ³¡ËùÓÐÈËÔ±µÄ°²È«¡£×ܰü·½Ðë¶ÔÊ©¹¤ÏÖ³¡ºÍ¹¤³Ì½øÐÐÓÐÌõÀíµÄ¹ÜÀí£¬ÒÔ±ÜÃâ²úÉú¶ÔËùÓÐÈËÔ±µÄ¸÷ÖÖΣÏÕ¡£
The General Contractor shall display during the hours of daylight, such lights, guards fences, warning signs, flags, signals and markings and during the hours of darkness such lights as the Government or other competent authority may require for the safety of aircraft or the public.
×ܰü·½ÐëÔÚ°×ÌìÌṩÏà¹ØµÄÕÕÃ÷¡¢·À»¤Õ¤À¸¡¢¾¯Ê¾ÅÆ¡¢ÆìÖÄ¡¢Ðźźͱêʶ£¬ÔÚÒ¹ÍíÌṩÕþ¸®ºÍÏà¹ØÈ¨Á¦²¿ÃÅ¿ÉÄÜΪ±£ÕϹ«ÖÚ»ò·ÉÐа²È«ËùÒªÇóµÄÕÕÃ÷ºÍ¾¯Ê¾µÆ¡£
The General Contractor shall ensure that all parts of the Site where work is being carried out are so lighted as to ensure the safety of all persons on or in the vicinity of the Site and of such work.
×ܰü·½ÐëÈ·±£ÕýÔÚÊ©¹¤µÄÏÖ³¡µÄËùÓв¿Î»»òËûµÄÁÙ½ü²¿Î»¶¼ÓÐÕÕÃ÷£¬ÒÔ±£ÕÏÏÖ³¡»ò¸½½üËùÓÐÈËÔ±µÄ°²È«¡£
The General Contractor, after obtaining any necessary approval from any relevant Authority, shall submit to Symantec proposals showing the layout of pedestrian routes, lighting, signage and guarding for any road opening or traffic diversion which may be required in connection with the execution of the Works. No such road opening or traffic diversion shall be brought into operation or use unless the proposals submitted have been previously approved by Symantec and guard the road opening or traffic diversion properly provided and implemented on the Site.
×ܰü·½Ôڵõ½Ïà¹ØÈ¨Á¦²¿ÃŵıØÒªÐí¿Éºó£¬ÐëÏò Ìá½»ÈËÐзÏߵĹ滮¡¢ÕÕÃ÷¡¢±êʶ¡¢¶ÔΪʵʩ¹¤³Ì¶øÐëÍÚ¿ªµÄÂ·Ãæ»ò½»Í¨Êèµ¼£¬¶ø²ÉÈ¡µÄ·À»¤´ëÊ©µÈÏà¹Ø·½°¸¡£ÔÚÌá½»µÄ¼Æ»®ºÍ·½°¸µÃµ½ Åú׼֮ǰ£¬²»µÃ¶ÔÂ·Ãæ½øÐпªÍÚ»ò½øÐÐÏà¹ØµÄ½»Í¨Êèµ¼£¬¶ÔÏÖ³¡ÍÚ¿ªµÄÂ·Ãæ»òÏÖ³¡ÌṩºÍʵʩµÄ½»Í¨Êèµ¼Ïß·£¬Ìṩ±£»¤¡£
Contracting qualification³Ð°ü×ʸñ
The General Contractor shall be responsible for obtaining the qualification to undertake contracting work locally from the relevant Authorities, and shall obtain all Government approvals relating to construction prior to the commencement of the Works.
×ܰü·½Ð븺ÔðÏòÓйز¿ÃÅÈ¡µÃÔÚµ±µØ³Ð°ü¹¤×÷µÄ×ʸñ£¬²¢ÔÚ¿ª¹¤Ç°»ñµÃÒ»ÇÐÕþ¸®·½ÃæÓëÊ©¹¤ÓйØÖ®Åú×¼¡£
Quality control bureauÖÊÁ¿¼à¶½²¿ÃÅ
The GC shall comply with all of the requirements of the local Quality Bureau and shall fully cooperate with the JianLi and all parties in regards to achieving an international grade A quality facility.
×ܰü·½Ó¦×ñÊØµ±µØÖÊÁ¿¼à¶½²¿ÃŵÄËùÓÐÒªÇó£¬È«ÃæÅäºÏ¼àÀíºÍÆäËû¸÷·½£¬Ê¹ÏîÄ¿´ïµ½¹ú¼ÊA¼¶ÖÊÁ¿±ê×¼¡£
12.0 SHOP DRAWINGS AND SPECIFICATIONÉî¼Ó¹¤Í¼Ö½ºÍ¼¼Êõ¹æ·¶
Drawings etc. at Site¹¤µØÏÖ³¡µÄͼֽ
A complete set of Contract Drawings and Specification(s) together with copies of all Variation Orders and additional drawings issued after the Date of Commencement shall be available on the Site at all times for reference by Symantec and the Symantec’s Project Manager.
¹¤µØÏÖ³¡ÐëÓÐÒ»Ì×ÍêÕûµÄºÏͬͼֽºÍÉè¼ÆËµÃ÷ÒÔ¼°¹¤³Ì¿ª¹¤ºóËùÓеıä¸üµ¥ºÍÐÞ¸Äͼֽ£¬ÒÔ¹© ¼°ÆäÏîÄ¿¾ÀíËæÊ±²éÔIJο¼¡£
The drawings shall be kept on well ordered drawing racks the GC shall maintain a drawing register of all drawings, all drawing issues and all modifications.
ͼֽӦ°´ºÏÀíµÄ˳ÐòÕûÆëµØ·Å×ßͼ¼ÜÉÏ£¬×ܰü·½Ó¦¶ÔËùÓÐͼֽ¡¢Í¼Ö½µÄÎÊÌâºÍÐÞ¸ÄÓÐÒ»¸öµÇ¼Ç¼Ç¼¡£
Shop drawings É¼Ó¹¤Í¼Ö½
Shop drawings will be required and shall be coordinated with other associated works and furnished by the General Contractor well before the work proceeds and in any case within one weeks of the Symantec's written request. The Symantec may reject, comment or amend such shop drawings. If the shop drawings are rejected, the General Contractor shall revise them according to the Symantec’s comments and resubmit the revised shop drawings for any further comment at the time as directed by Symantec. No claim will be accepted for comment or amendments required by the Symantec.
ÔÚ¹¤³Ì¿ªÊ¼Ç°£¬×î³ÙÊÇÔÚ·¢°ü·½·¢³öÊéÃæÒªÇóµÄÒ»ÖÜÖ®ÄÚ£¬×ܰü·½ÐëÌṩÓë¸÷רҵÒÑе÷ºÃµÄÉ¼Ó¹¤Í¼Ö½¡£·¢°ü·½ÓÐȨ¶ÔÕâЩʩ¹¤Í¼Ö½½øÐзñ¾ö¡¢ÆÀÂÛ¡¢ºÍÐ޸ġ£Èç¹ûÉ¼Ó¹¤Í¼Ö½±»·ñ¾ö£¬³Ð°ü·½Ðë¸ù¾Ý µÄÒâ¼û½øÐÐÐ޸쬲¢ÐëÔÚ ¹æ¶¨µÄʱ¼äÄÚÖØÐÂÌá½»Ð޸ĺóµÄÉ¼Ó¹¤Í¼Ö½£¬ÒÔ¹© ¶ÔÆä½øÐнøÒ»²½ÉóºË¡£Õë¶Ô ÒªÇóµÄÉóºËºÍÐ޸ĶøÌá³öµÄ²¹³¥½«²»Óè½ÓÊÜ¡£
Measurement Accuracy²âÁ¿µÄ¾«¶È
The units of billing for measured omissions and additions for variations or additions of re-measurements where the unit is either m3 or m2 the quantities shall be billed to the nearest 0.10 of a whole unit and where the unit is either m or kg the quantities shall be billed to the nearest 0~10 .
¼ÆÁ¿µ¥Î»Èç¹ûÊÇm3 »ò m2£¬Ó¦¾«È·µ½¼ÆÁ¿µ¥Î»×î½üµÄ0.10£¬Èç¹û¼ÆÁ¿µ¥Î»ÊÇm »ò kg£¬ÔòÓ¦¾«È·µ½×î½üµÄ0~10 ¡£
13.0 MATERIALS AND WORKMANSHIP²ÄÁϺ͹¤ÒÕ
Compliance with Regulations·ûºÏ¹æ·¶
Materials, workmanship and the works as a whole shall conform to or be of a higher standard than the minima required by the Contract, legislations, regulations, byelaws or notices of the Government or Authority or other statutory undertaker which has jurisdiction with regard to this Contract.
ËùÓÐÊ©¹¤¡¢²ÄÁÏ¡¢¹¤ÒÕÐëÈ«²¿·ûºÏ»ò¸ßÓÚºÏͬÖй涨µÄ»ù±¾ÒªÇó£¬ÒÔ¼°¹ú¼Ò»òµØ·½Õþ¸®»ò¶Ô±¾¹¤³ÌÓйÜϽȨµÄȨÁ¦²¿ÃÅ»òÖ´·¨»ú¹ØËùÖÆ¶¨µÄ·¨ÂÉ¡¢·¨¹æ¡¢µØ·½ÌõÀý»ò֪ͨÖÐËù¹æ¶¨µÄ×îµÍ±ê×¼¡£
Where different standards occur as specified therein, the higher standard shall prevail.
Èç±ê×¼²»Í¬£¬ÒԽϸߵıê׼Ϊ׼¡£
SamplesÑù±¾
The quality of materials and articles supplied for any purpose are to be approved by Symantec prior to their use in the Works. Wherever practicable samples are to be submitted for approval before bulk supplies are delivered to the site. Approved samples are to be kept on site to serve as standards for the materials or goods represented by the samples. Samples, and any packing for same, are to be provided free of charge by the General Contractor and shall fully comply with the Contract.
ÓÃÓÚ±¾¹¤³ÌÖ®ÈκÎÎïÁϵÄÖÊÁ¿£¬ÔÚʹÓÃǰ±ØÐëµÃµ½xxxxµÄÈϿɡ£ÔÚ´óÅúÎïÁÏË͵½ÏÖ³¡Ç°£¬±ØÐëÌṩÑù±¾£¬ÓÉxxxxÉóÅú¡£×ܰü·½ÐëÔÚ¹¤µØ±£´æÈϿɵÄÑù±¾£¬×÷ΪÒÔºóÑéÊÕ¹¤³ÌµÄ±ê×¼¡£ÑùÆ·¼°ÆäËûÀàËÆÎïÆ·¾ùÓÉ×ܰü·½Ãâ·ÑÌṩ£¬²¢Ó¦×ñÊØºÏͬҪÇó¡£
Should any material or article be rejected it shall be removed from the site at the General Contractor's expense.
×ܰü·½Ðë×ԷѰÑÈκα»¾Ü¾øÊ¹ÓõÄÎïÁϳ·³ö¹¤µØ¡£
The General Contractor shall provide Mock ups and samples of workmanship for all trades and obtain the Symantec's approval and a Start Work notice prior to commencement of each trade.
×ܰü·½Ðë¶ÔËùÓеÄרҵµÄ¹¤ÒÕÌṩÑù°åºÍÑùÆ·£¬²¢ÐëÔÚÿ¸öרҵ¿ªÊ¼¹¤×÷ǰ»ñµÃxxxxµÄÈ·ÈϺÍÅú×¼£¬²¢»ñµÃ¿ª¹¤Í¨Öª¡£
All subsequent work and workmanship shall be to the standard set of by the approved Samples of work, Mock ups and the approved samples.
ËùÓÐËæºóÕ¹¿ªµÄ¹¤×÷ºÍ¹¤ÒÕÐëºÍÈϿɵŤ³ÌÑù°åºÍÑùÆ·µÄ±ê×¼Ò»Ö¡£
Safe custody of materials²ÄÁϵݲȫ±£¹Ü
The General Contractor shall be responsible for the safe custody and proper protection of all materials delivered on to the site including those for Named Sub-Contractors or Separate Specialist Firms. He will be required to reinstate at his own expense any such materials that may be lost or stolen.
×ܰü·½Ð븺ÔðÍ×ÉÆ°²È«±£¹ÜÔ˵½¹¤µØµÄ²ÄÁÏ£¬°üÀ¨±»Ö¸¶¨µÄ·Ö°ü·½»ò¶ÀÁ¢µÄרҵʩ¹¤µ¥Î»µÄÎïÁÏ¡£×Էѻָ´ÈκÎÒÅʧ»ò±»ÍµÇԵIJÄÁÏ¡£
He will also be required to reinstate at his own expense any material or article damaged by careless handling or storage or as a result of inferior workmanship by his workmen either in the original fixing or in the subsequent taking down and re-fixing thereof.
×ܰü·½Ðë×Էѻָ´Òò²Ù×÷²»Ð¡ÐÄ¡¢Öü´æ²»µ±¡¢»òÆä¹¤ÒÕµÍÁÓ(²»¹ÜÊÇÔÚ×î³õ°²×°Ê±»òÊÇÔÚºóÀ´²ðжÔÙ°²×°Ê±·¢ÉúµÄ)¶øË𻵵ÄÈκÎÎï×Ê¡£
Loading and unloading of materials²ÄÁϵÄװж
The General Contractor shall take every care in the loading and off-loading of materials for the work, ensure that the street, roads, footpaths and landlord area are not obstructed or damaged in any way or that the traffic is impeded and he shall conform with the police regulations therewith. Off-loading shall be undertaken at a point agreed with CDHT and the local authorities if not within the confines of the site.
×ܰü·½Ð뾡Á¿Ð¡ÐÄװж²ÄÁÏ£¬²»µÃ×èÈû»òÆÆ»µ½ÖµÀ¡¢¹«Â·¡¢ÈËÐеÀºÍÒµÖ÷µÄµØ¿é£¬Ò»µ©½»Í¨¶ÂÈû£¬Ó¦×ñÊØÏà¹ØµÄ¹«°²ÌõÀý¡£Ð¶»õµØµãÈç²»ÔÚ¹¤µØ·¶Î§ÄÚ£¬ÐëÔڳɶ¼¸ßÐÂÇøºÍµ±µØ²¿ÃÅͬÒâµÄµØµã½øÐС£
Mock upsÑù°å
Symantec requires mock ups to be completed by the GC prior to practical works to be commenced according to the elements identified in the Design Pack (see Appendix 1 of the tender document). The mock ups would be inspected and signed off by Symantec upon they are fully in compliance with the expectations. The signed off mock ups would be the quality benchmark of all relevant GC works in this project. No further work can commence without a Start Work notice from G&T. All delays and the cost of delay that result from inadequate mock ups will lie with the GC.
xxxxÒªÇó×ܰü¿ªÊ¼Êµ¼Ê¹¤³Ìǰ£¬°´ÕÕÉè¼ÆÎļþ£¨ÕбêÎļþ¸½Â¼1£©Íê³ÉÓйØÏîÄ¿µÄÑù°å½¨Éè¡£xxxxÔÚ¼ì²éÑù°å£¬²¢ÈÏΪºÍÔ¤ÆÚÒ»Öº󣬽«ÓèÒÔÅú×¼¡£Åú×¼ºóµÄÑù°å½«×÷Ϊ×ܳаü·½ËùÓб¾¹¤³ÌÏà¹ØÏîÄ¿µÄÖÊÁ¿±ê×¼¡£Ã»ÓÐG&TµÄ¿ª¹¤Í¨Öª£¬²»µÃ½øÐÐÏÂÒ»²½¹¤×÷¡£ÓÉÓÚ²»³ä·ÖµÄÑù°å¶øÔì³ÉµÄËùÓÐÑÓÎóºÍÑÓÎó·ÑÓ㬽«ÓÐ×ܳаü·½³Ðµ£¡£
The GC shall carry out works for mock ups including but not limited to:-
×ܰü·½Ó¦ÊµÊ©µÄÑù°å¹¤³Ì°üÀ¨µ«²»ÏÞì¶£º
Produce a detailed mock up schedules and incorporate into the GC construction schedule with sufficient time allowances for inspections, rectifications and sign off for Symantec and G&T review and approval.
ÖÆ¶¨ÏêϸµÄÑù°å¹¤³Ì¼Æ»®£¬²¢ºÏ²¢µ½×ܳаü·½µÄÊ©¹¤¼Æ»®£¬²¢³ä·Ö¿¼ÂǼì²é¡¢¾ÀÕýºÍxxxx¼°G&TÉóºËÅú×¼µÄʱ¼ä¡£
Review and understand the relevant part of mock ups in deign package and implement the material preparation, fabrication and installation according to the approved mock up schedule.
ÔĶÁºÍÀí½âÉè¼Æ×ÊÁÏÖйØÓÚÑù°å²¿·ÖµÄ×ÊÁÏ£¬¸ù¾ÝÅú×¼µÄÑù°å¼Æ»®£¬½øÐвÄÁÏ×¼±¸¡¢ÖÆ×÷ºÍ°²×°¡£
Upon on sign off of the mock ups, the GC shall maintain and protect the mock ups in a good condition fashion and use it as:-
¶ÔÓÚÅú×¼µÄÑù°å£¬×ܰü·½Ó¦±£³ÖÆäÁ¼ºÃµÄ×´¿ö£¬ÒԱ㽫Ëü×÷Ϊ£º
i) Benchmark of all relevant works of the projectÏà¹Ø¹¤³ÌÏîÄ¿µÄ±ê×¼
ii) The training demonstrations to all relevant workers to understand the quality standards
×÷ΪÏà¹Ø¹¤ÈËÀí½âÖÊÁ¿±ê×¼µÄѵÁ·½Ì²Ä
• The mock ups should include, but not limited to:- Ñù°åÓ¦°üÀ¨µ«²»ÏÞÓÚ£º
i) Module board assembly Ä£°å×é×°
ii) Pre-cast concrete workmanships Ô¤ÖÆ»ìÄýÍÁ¹¤ÒÕ
iii) Roof water proof installation ÎÝÃæ·ÀË®°²×°
iv) Rebar fabrication and assembly ¸Ö½îÖÆ×÷ºÍ°²×°
v) Steel structure components with welding and bolts connection
¸Ö½á¹¹¹¹¼þµÄº¸½ÓºÍÂÝ˨Á¬½Ó
vi) Pre-embedded conduits and back boxes installation
Ô¤Âñ¹ÜµÀºÍÁ¬½ÓÏߺеݲװ
vii) Slab and wall penetration Â¥°åºÍǽµÄ´©Í¸
viii) Wall / partition (brick, glazed, concrete and gypsum etc.) sections with primary and final finishing.
ǽ£¨×©¡¢²£Á§¡¢»ìÄýÍÁºÍʯ¸àµÈµÈ£©µÄ³õ×°ÐÞºÍ×îºó×°ÐÞ
ix) Floor (granite, carpet, raised floor, wood, painting and / or epoxy etc.) fit out in different function areas including lobby, corridors, office area, lab, IT room and plant room etc.
ÔÚ²»Í¬ÇøÓò£¨´óÌü¡¢×ßÀÈ¡¢°ì¹«ÊÒ¡¢ÊµÑéÊÒ¡¢ITÊÒºÍÉ豸·¿µÈµÈ£©µÄµØ°å£¨»¨¸ÚÑÒ¡¢µØÌº¡¢»îµØ°å¡¢Ä¾¡¢ÓÍÆáÒÔ¼°Ê÷Ö¬µÈµÈ£©×°ÐÞ
x) Door (wood, glazed and alumina etc) and windows installation with finishing
ÃÅ£¨Ä¾¡¢²£Á§ºÍÂÁºÏ½ðµÈµÈ£©ºÍ´°µÄ°²×°¼°×°ÐÞ
xi) Brackets and supports of trays, pipes, ducts and conduits Çżܡ¢¹ÜµÀµÄÖ§³ÅºÍÖ§¼Ü
xii) Ducts, pipes and cable trays fabrication and installation
¹ÜµÀºÍµçÀÂÇżܵÄÖÆ×÷ºÍ°²×°
xiii) Under-floor air condition system structure °²×°ÓڵذåϵĿյ÷ϵͳ½á¹¹
xiv) Insulation for different section shapes of pipes, ducts and conduits and M&E system components.
²»Í¬ÐÎ×´µÄ¹ÜµÀºÍ»úµçϵͳ¹¹¼þµÄ¾øÔµ±£ÎÂ
xv) Sockets / switches / data points / diffuses / light fixtures installation
²å×ù¡¢¿ª¹Ø¡¢Êý¾Ý½Ó¿Ú¡¢·ç¿ÚºÍµÆ¹â×é¼þµÄ°²×°
xvi) Wall mounted, ground mounted and suspended equipments installations.
¹Ì¶¨ÔÚǽÉÏ¡¢Â¥ÃæºÍÐü¿ÕµÄÉ豸µÄ°²×°
xvii) Equipment installation. É豸°²×°
xviii) Noise-proof installation under different requirements ÔÚ²»Í¬ÒªÇóϵĸôÒô´ëÊ©
xix) Toilets fit out and sanitary installation ½à¾ßºÍÎÀÉú×°Öõݲװ
xx) Typical office area with all requested fit out and finishing including the wiring solution to the workstations etc
±ê×¼°ì¹«Çø£¬°üÀ¨ËùÓÐÒªÇóµÄ×°ÐÞ£¬Óë°ì¹«¼Ò¾ßµÄ½ÓÏߵȵÈ
xxi) Typical lab areas with all requested fit out and finishing
±ê׼ʵÑéÊÒÇø£¬°üÀ¨ËùÓÐÒªÇóµÄ×°ÐÞ
xxii) Pantry corner with loose furniture including basins and accessories
xxiii) ²ÍÌü£¬°üÀ¨³ø¾ß£¬Ë®³ØºÍ¸½¼þ
xxiii) Cladding system with supports and glazed panel installation
Ļǽ£¬°üÀ¨Ö§³ÅºÍ²£Á§µÄ°²×°
xxiv) Interior and exterior stone surface installation ÊÒÄÚÍâʯ²ÄµÄ¹Ò×°
xxv) External paving, landscaping and edge details. ÊÒÍâÆÌµØµØÃæ¡¢¾°¹ÛºÍϸ²¿´¦Àí
xxvi) Etc ÆäËû
The sums identified for the above will be allowed for within the Bills of Quantities shall be administered to the GC at the sole discretion of Symantec and G&T. The GC has no contractual right to these sums but his contractually obligated to comply with all Mock up requirements. Symantec and G&T shall assign these sums in a manner that reflects the professionalism of the contractors’ performance of mock ups on the project.
ÔÚ¹¤³ÌÁ¿±íÖÐÈ·ÈϵÄÕë¶ÔÒÔÉÏÌõÎÄËùÉæ¼°µÄ·ÑÓÃ×ܺͱ»ÈÏΪ°üÀ¨ËùÓÐÔÚºÏͬÎļþÖÐÁгöµÄÑù°åÒªÇó¡£ ÕâЩ·ÑÓÃÓÉxxxxºÍ***¹«Ë¾¾¹ýͨ¹ý¶ÀÁ¢Åжϣ¬¾ÓÉ***¹«Ë¾À´¿ØÖƺͻ®²¦¸ø×ܰü¡£×ܰü¶ÔÕâ±Ê·ÑÓÃûÓкÏͬȨÀû£¬µ«ÊÇÓкÏ֮ͬÒåÎñÀ´Íê³ÉÂÄÐÐÑù°åÒªÇó¡£xxxxºÍ***¹«Ë¾½«ÔÚ×ܰüÍêÈ«ÌåÏÖ³öÔÚÏîÄ¿Ñù°åÌṩºÍÍê³É·½ÃæµÄרҵÐԵĻù´¡ÉÏ»®²¦ÕâЩ·ÑÓá£
In the event, that the GC fails to meet all mock up requirements, Symantec reserve the right to fine the contractor a commensurate sum and to avail of all remedies available in the contract.
Èç¹û×ܰüÎÞ·¨Âú×ãËùÓеÄÑù°åÒªÇó£¬xxxx½«±£Áô¶Ô×ܰü½øÐÐÏàÓ¦³Í·£µÄȨÁ¦£¬²¢¿Û³ýºÏͬÖÐÊ£ÓàÏà¹Ø·ÑÓá£
14.0 PROTECTION OF PUBLIC PROPERTY, ETC.¹«¹²²Æ²úµÄ±£»¤
Protection of public¹«ÖÚ±£»¤
The General Contractor is to take every precaution necessary to protect the public from injury or death during the course of the Works.
×ܰü·½ÐëÔÚ¹¤³Ì½øÐÐÆÚ¼ä½ß¾¡È«Á¦±£»¤¹«ÖÚÃâÊÜËðÉ˼°ËÀÍö¡£
Protection of public property¹«¹²²Æ²úµÄ±£»¤
The General Contractor shall maintain and protect all public property and roads and property of the Public Utility Service Companies and bear all costs incurred in making good any damage caused thereto.
×ܰü·½Ó¦Î¬³Ö¼°±£»¤ËùÓй«¹²²Æ²ú¡¢µÀ·¡¢¹«¹²ÉèÊ©·þÎñ¹«Ë¾µÄ²Æ²úµÈ£¬²¢³Ðµ£ÐÞ¸´Ëð»µËùÐèµÄÒ»ÇзÑÓá£
Prior to commencement of work on site, the General Contractor shall inspect and record conditions of the structures and finishes of the adjacent buildings.
ÔÚ¿ª¹¤Ç°£¬×ܰü·½Ðë¼ì²éºÍ¼Ç¼ÏàÁÚ½¨ÖþÎïµÄ½á¹¹Çé¿öºÍ½¨ÖþÎïµÄÍâ¹ÛÇé¿ö¡£
Protection of adjoining propertyÁÚ½ü²Æ²úµÄ±£»¤
The General Contractor shall take every precaution necessary to protect adjoining property from damage and shall bear all costs incurred in remedying damage caused through lack of proper care on his part.
×ܰü·½Ðë½ß¾¡È«Á¦±£»¤ÁÚ½üµÄ²Æ²ú²»ÊÜË𻵣¬²¢³Ðµ£ÓÉÓÚÆä¿´»¤²»µ±¶øÒýÆðµÄË𻵲¿·Ö½øÐÐÐÞ¸´µÄ·ÑÓá£
Maintenance of existing roads, footpaths, steps and CDHT areas, etc.
ά»¤ËùÓÐÏÖÓеÀ·¡¢ÈËÐеÀ¡¢Ì¨½×ÒÔ¼°³É¶¼¸ßÐÂÇø³¡µÄ³¡µØµÈ¡£
Maintain all existing roads, footpaths, steps and landlord areas, etc. and reinstate any damage caused by any reason whatsoever during the progress of the Works.
ÔÚ¹¤³Ì½øÐÐÆÚ¼äά»¤ËùÓÐÏÖÓеÀ·¡¢×ßµÀ¡¢Ì¨½×ÒÔ¼°ÊôÓÚÒµÖ÷µÄ³¡µØµÈ£¬²¢ÐÞ¸´ÔÚ¹¤³Ì½øÕ¹ÖÐÒòÈκÎÔÒòÒýÆðµÄË𻵡£
It will be the General Contractor's responsibility to ensure that the roads leading to and around the Site are kept free from obstruction brought about by the work on this Site and in no way shall he cause any hindrance to traffic or ancillary works either by his own vehicles, or by his workpeople, materials, etc.
×ܰü·½Ð뱣֤ͨÏò¹¤µØ¼°ÖÜΧµÄµÀ·²»»áÒò¹¤³Ì¶øÊÜ×裬²¢ÇÒ²»ÈÝÐíÆä³µÁ¾¡¢¹¤ÈË¡¢²ÄÁÏ¡¢µÈ¶Ô½»Í¨»òÆäËû¸¨ÖúÐÔ¹¤³Ì²úÉú·Á°¡£
The General Contractor shall be responsible for repairing damage to private streets and access roads if deterioration occurs during the Contract Period.
×ܳаü·½Ð븺ÔðÐÞ¸´ÔÚºÏͬ¹¤ÆÚÄÚËùË𻵵Ä˽È˽ֵÀºÍ¹«Â·¡£
Maintenance of existing trees and shrubsÏÖÓÐÊ÷ľºÍÖ²±»µÄά»¤
Where is necessary, all trees and shrubs must be maintained and protected.
ÈçÓÐÐèÒª£¬Ó¦±£»¤ËùÓÐÊ÷ľºÍÖ²±»¡£
Maintenance of existing services¶ÔÒÑÓÐÉèÊ©µÄά»¤
The General Contractor shall ensure that any existing services such as electric power, telephone, water, gas or drainage to adjacent properties and buildings which pass through the site or in building areas are maintained during the course of the Works.
ÔÚ¹¤³Ì½øÐйý³ÌÖУ¬×ܰü·½ÐëÈ·±£¶Ô¾¹ý¹¤µØÏÖ³¡Í¨ÏòÁÚ½ü½¨ÖþÎïµÄ°üÀ¨µçÁ¦¡¢µç»°¡¢¹©Ë®¡¢ÃºÆø¡¢ÏÂË®µÈÒÑÓеÄÊÐÕþ¹«ÓÃÉèÊ©½øÐÐά»¤¡£
The General Contractor shall arrange with the CDHT¡¢ Government or the Public Utility companies for any necessary disconnection or diversion of drains or other services.
×ܰü·½Ð븺ÔðÓë³É¶¼¸ßпª·¢Çø¡¢Õþ¸®»òÕß¹«ÓÃÊÂÒµ²¿ÃÅÈ¡µÃÁªÏµ£¬¾ÍÓйضÔÅÅË®¹µ»òÆäËûÉèÊ©Ëù½øÐеÄÒ»ÇбØÒªµÄÇжϻòÊèµ¼ÓèÒÔ°²ÅÅ¡£
Construction of works close to buildings, roads and other structures
Ê©¹¤ÏÖ³¡¸½½üµÄ½¨ÖþÎï¡¢µÀ·ºÍÆäËû½á¹¹ÉèÊ©
Care must be taken in constructing works near buildings, or landlord plant roads, and other structures and the General Contractor shall bear all costs incurred in remedying any damage caused through lack of proper care on his part.
×ܰü·½Ðë¶Ô¿¿½ü½¨ÖþÎï¡¢µÀ·ºÍÆäËû½á¹¹ÉèÊ©µÄÊ©¹¤¹¤×÷СÐÄʵʩ£¬²¢³Ðµ£¶ÔÒòȱÉÙÊʵ±±£»¤´ëÊ©¶øÒýÆðµÄË𻵲¿·Ö½øÐÐÐÞ¸´µÄ·ÑÓá£
Restrict nuisance of dust and noise¼õÉÙÔëÉùºÍ³¾°£²úÉúµÄΣº¦
The General Contractor is to take all necessary steps to restrict the nuisance of dust and noise. Pneumatic drills shall be fitted with silencers. Compressors shall be in good order to run as quietly as possible and shall be placed in position as far away as possible from adjoining premises. The General Contractor shall take care to abate the nuisance caused by dust and shall sprinkle dusty areas with water frequently.
×ܰü·½Ðë²ÉȡһÇбØÒªµÄ²½ÖèÀ´¼õÉÙ³¾°£ºÍÔëÉù²úÉúµÄµÄΣº¦¡£·ç¶¯×ê»úÐë×°ÅäÏûÉùÆ÷£¬Ñ¹Ëõ»úÒª±£³ÖÐÔÄÜÁ¼ºÃ¼°¾¡¿ÉÄܵÍÒôµØÔËת£¬²¢Òª°²ÖÃÔÚ¾¡¿ÉÄÜÔ¶ÀëÁÚ½ü·¿Îݵĵط½¡£×ܳаü·½ÐëÉè·¨¼õÉÙ³¾°£Ôì³ÉË𺦣¬ÔÚÓг¾°£µÄµØ·½¾³£È÷Ë®¡£
Suppressor¸ÉÈÅÒÖÖÆÆ÷
All mechanical plant shall be fitted with radio and T.V. interference suppressor.
ËùÓлúеºÍÉ豸Ðë×°ÅäÎÞÏßµç×°Öú͵çÊÓ¸ÉÈÅÒÖÖÆÆ÷¡£
15.0 ARTISTS OR TRADESMEN NOT SUB-CONTRACTORS
ÒÕÊõ»òרҵ¹¤½³µÈ·Ç¹¤³Ì·Ö°üÉÌ
The General Contractor shall permit the execution of Works by Artists or Tradesmen who are not engaged by the GC and who may be engaged by Symantec..
×ܰü·½ÐëÔÊÐí·ÇÆä¹ÍÓõ쬵«¿ÉÄÜÊÇxxxx¹ÍÓõÄÒÕÊõ¼Ò»òרҵ¹¤½³µÈ·Ç¹¤³Ì·Ö°üÉÌÔÚÏÖ³¡¿ªÕ¹¹¤×÷¡£
The General Contractor shall afford all reasonable opportunities to such Artists, Tradesmen or Specialist Contractors employed direct by Symantec for the carrying out of their work. Such facilities shall include the reasonable use by others of any scaffolding or staging erected by the General Contractor for his own use but the General Contractor shall not be required to maintain any such scaffolding or staging longer than is necessary for his own use or to erect any special scaffolding or staging for the use of others unless otherwise described in the "Prime Cost and Provisional Sums" Schedule.
×ܰü·½ÐëΪÕâЩxxxxÖ±½Ó¹ÍÓõÄÒÕÊõºÍרҵ¹¤½³ÒÔ¼°Æäרҵʩ¹¤ÈËÔ±¿ªÕ¹¹¤×÷ÌṩËùÓпÉÄܵÄÉèÊ©¡£´ËÀàÉèÊ©°üº¬¿ÉÒÔ¶ÔÒѼÜÉèµÄ½ÅÊּܽøÐкÏÀíʹÓᣵ«µ±×ÔÉí²»ÔÙÐèÒªÕâЩ½ÅÊÖ¼Üʱ£¬³ý·ÇÊÇÔÚ‘×ÜÔì¼ÛºÍÔÝÁпî’ÀïÁíÓй涨£¬×ܰüµ¥Î»Ã»ÓÐÔðÈκÍÒåÎñΪÆäËû·½¼ÌÐø±£Áô»ò¼ÜÉèÕâЩ½ÅÊּܡ£
16.0 INSTRUCTIONS, VARIATIONS AND METHODS OF MEASURING AND VALUING
¹¤³ÌÖ¸Áî¡¢±ä¸ü¡¢²âÁ¿ºÍ¹À¼ÛµÄ·½·¨
Method of Valuation using the Bill of Quantizes
ʹÓù¤³ÌÁ¿Çåµ¥µÄÆÀ¹À·½·¨
Only Provisional Sums, Provisional Quantities and Variations will be measured and valued in accordance with the Contract Documents.
Ö»ÓÐÔݹÀ¿îÏî¡¢ÔݹÀ¹¤³ÌÁ¿ºÍ±ä¸ü»áÒÀÕÕºÏͬÎļþ½øÐÐÆÀ¹ÀºÍ¹À¼Û¡£
No adjustment will be made to the contract rates used for pricing nor extension of time allowed to the Contract Period should the final quantities differ from the original quantities inserted.
Èç¹û×îºóµÄ¹¤³ÌÁ¿ºÍ×î³õÌá½»µÄ¹¤³ÌÁ¿²»Í¬£¬ºÏͬ¶¨¼ÛÖеĵ¥¼Û½«²»»á×÷ÏàÓ¦µ÷Õû²¢ÇÒÒ²²»¿ÉÒò´Ë¶Ô¹¤³Ì½øÐÐÑÓÆÚÉêÇë¡£
Unless otherwise stated all items in the Bill of Quantities specifying materials, fittings, etc. are to be read in that such materials, fittings, etc. are to be provided, and fixed by the General Contractor.
³ý·ÇÁíÓÐ˵Ã÷£¬ËùÓе¥¼Û±íÀïÃæËµÃ÷µÄ²ÄÁÏ¡¢×°ÖõȵȽ«Òâζ×ÅÓÉ×ܳаü·½ÌṩºÍ°²×°¡£
All the materials to be used in permanent works described in these Bills of Quantizes shall be new and recently purchased.
ËùÓб¾±¨¼Û±íÀïÃèÊöµÄÓÃÓÚÓÀ¾ÃÐÔ¹¤³ÌÖеIJÄÁÏÐëΪвÄÁÏ£¬×î½ü¹ºÂòµÄ¡£
Dimensions ³ß´ç
Figured dimensions are to be taken in preference to scaled in all cases. Before commencing any work or ordering any materials the General Contractor must verify all measurements. If any discrepancies are found they must be brought to the notice of Symantec immediately.
ÔÚÈκÎÇé¿öÏÂÒªÓÅÏÈʹÓÃͼֽÉϱê×¢µÄ³ß´ç¶ø²»ÊÇÓñÈÀý³ßÈ¥Á¿¶È¡£ÔÚ¿ªÊ¼Èκι¤×÷»òÕß¶©¹ºÈκβÄÁÏǰ£¬×ܳаü·½±ØÐëºË¶ÔËùÓгߴ硣Èç·¢ÏÖÓÐÈÎºÎÆ«²î£¬±ØÐëÁ¢¼´ÒÔÊéÃæÐÎʽ֪ͨ ¡£
Site instructions¹¤µØÏÖ³¡Ö¸Áî
The General Contractor shall maintain an efficient organization so that all instructions issued by Symantec are communicated immediately to the site and to his sub-contractors and to the named sub-Contractors and Suppliers and he shall take instructions only from Symantec through the Symantec’s Project Manager in writing.
×ܰü·½Ðë³ÉÁ¢Ò»¸öÓÐЧµÄ×éÖ¯À´È·±£½«ËùÓÐ ·¢³öµÄÖ¸ÁîÁ¢¼´´«´ïµ½¹¤µØÏÖ³¡ºÍ¸÷·Ö°üÉÌÒÔ¼°Ö¸¶¨·Ö°ü·½/¹©Ó¦ÉÌ£¬²¢ÇÒ½ö½ÓÊÜÀ´×Ô Í¨¹ýÆäÏîÄ¿¾Àí·¢²¼µÄÊéÃæÖ¸Áî¡£
The General Contractor shall log all site instructions given to him by Symantec through the Symantec’s Project Manager in an MS Excel spreadsheet in English and Chinese including all fields that are included within the Project Managers Instruction. Such file shall be made available to Symantec and the Symantec’s Project Manager on a weekly basis.
×ܰü·½Ð뽫ËùÓÐxxxxͨ¹ýÆäÏîÄ¿¾Àí¶Ô·¢²¼µÄÖ¸ÁÒÔÖÐÓ¢ÎļǼÔÚMS Excelµç×Ó±í¸ñÖУ¬¼Ç¼ÄÚÈݰüÀ¨¶Ô½ÓÊÜÏà¹ØÖ¸ÁîµÄËùÓÐÄÚÈÝ£¬¸ÃÎļþӦÿ¸öÐÇÆÚÏòxxxx¼°ÆäÏîÄ¿¾ÀíÌṩ¡£
Start Work / Stop Works Instructions¿ª¹¤»òÍ£¹¤Ö¸Áî
Symantec and his Project Manger is empowered to start and stop all work or any part of the Works if the GC is not in compliance with any obligation under the Contract. Any delay, damages and costs that result from such a notice shall fall with the GC.
Èç¹û×ܰü·½Î¥·´ºÏͬ£¬xxxxºÍËûµÄÏîÄ¿¾ÀíÓÐȨҪÇ󹤳̿ª¹¤»òÍ£¹¤¡£ÈκÎÓÉÓÚÕâÑùµÄ֪ͨÔì³ÉµÄÑÓÎó¡¢Ë𻵺ͷÑÓÃÓ¦ÓÉ×ܳаü·½³Ðµ£¡£
General Contractor's claims for extras for verbal instructions×ܰü·½¶Ô¿ÚÍ·Ö¸ÁîµÄË÷Åâ
No works shall be instructed verbally. Only works instructed under formal written Project Management Instructions counter signed by Symantec will be considered for valuation of the works.
Èκι¤³Ì²»Äܽöƾ¿Úͷָʾ¡£Ö»ÓÐÓÉxxxxÇ©ÊðµÄÏîÄ¿¹ÜÀíÖ¸ÁîÒªÇóµÄ¹¤×÷£¬¿ÉÒÔ×÷Ϊʵ¼Ê¹¤×÷ÆÀ¹À¡£
Invoices, receipts, etc.·¢Æ±£¬ÊվݵÈ
The General Contractor shall produce all original invoices, vouchers or receipted accounts for any materials or sub-contract labour charges when called upon to do so by Symantec. A photocopy of the invoices, receipts etc. shall also be provided to Symantec. After verification by Symantec, the originals shall be returned to the General Contractor.
µ±xxxxÒªÇóʱ£¬×ܰü·½ÐëÌá½»ËùÓвÄÁÏ»ò·Ö°üÀÍÎñ·ÑÓõÄÔʼ·¢Æ±¡¢Æ¾Ö¤¡¢Êվݵȣ¬²¢ÌṩÕâЩ·¢Æ±¡¢Êվݵȵĸ´Ó¡¼þ¸øxxxx¡£Ô¼þÔÚxxxxºË¶Ôºó£¬»á·¢»¹¸ø×ܳаü·½¡£
The General Contractor's expenses in connection with variations and settlement of
accounts
×ܰü·½Óë±ä¸üÏà¹ØµÄ·ÑÓü°½áËã
The General Contractor shall be responsible for making or procuring at his own expense such additional copies of Symantec’s instructions and any specifications, schedules, drawings and details issued therewith as are necessary for distribution within his own organization and to named Sub-Contractors and named Suppliers as required.
×ܰü·½Ðë×Ô·Ñ»ñµÃ»ò¸´Ó¡¶îÍâµÄ£¬ÓÃÓÚÆäÄÚ²¿·Ö·¢£¬ºÍÐèҪת·¢¸øÖ¸¶¨µÄ·Ö°ü·½ºÍ¹©Ó¦ÉÌµÈµÄ µÄÖ¸Áî¡¢¹æ·¶¡¢¼Æ»®¡¢Í¼Ö½ºÍÏêͼµÈ¡£
Symantec will not be liable for any expense incurred by the General Contractor in connection with the measurement of variations or the adjustment and settlement of accounts.
½«²»³Ðµ£×ܰü·½»¨ÔÚÓÃÓÚ±ä¸ü²âÁ¿»òµ÷Õû½áËãÉÏ·¢ÉúµÄ·ÑÓá£
Supportive documentation for a fair valuation¹«Æ½¹À¼ÛËùÐèµÄÖ§³ÖÐÔÎļþ
Where it becomes necessary for a fair valuation to be made, as required under the Construction Project Contract, the General Contractor shall provide all supportive documentation as may reasonably be required by Symantec to make such fair valuation, and this shall be provided by the General Contractor within two (2) weeks of the Symantec 's formal request.
ÒÀ¾ÝºÏͬÌõ¿î¹æ¶¨£¬µ±ÐèÒª½øÐй«Õý¹À¼Ûʱ£¬×ܰü·½ÐëÏòxxxxÌṩËùÒªÇóµÄËùÓй«Æ½¹À¼ÛËùÐèµÄÖ§³ÖÐÔÎļþ£¬Ìύʱ¼äΪÔÚxxxxÕýʽҪÇóºóµÄ2¸öÐÇÆÚÄÚ¡£
Appendix A–LEED-NC Green building Certification Construction Requirement dated 18th January 2008 (refer to the file included in the Construction Design Pack of the Tender Document)
¸½¼þ A – LEEDTMÂÌÉ«½¨ÖþÈÏ֤ʩ¹¤ÒªÇóÖ¸ÄÏ£¬2008Äê1ÔÂ18Èհ棨Çë²ÎÔÄÕбêÎļþÖеijÉÌ×Ê©¹¤Í¼Éè¼ÆÎļþ£©
Appendix B–Testing and Commission Specification (refer to the Construction Design Pack of the tender document and it may be updated in Part II of the Tender Document)
¸½¼þ B – µ÷ÊԺͲâÊÔ˵Ã÷(Çë²ÎÔÄÕбêÎļþÖеijÉÌ×Ê©¹¤Í¼Éè¼ÆÎļþ£¬Õâ¸öÎļþ¿ÉÄÜÔÚµÚ¶þ²¿·ÖÕбêÎļþÖÐÐÞÕý¡£)
Appendix C–Sample Schedules (refer to the Construction Design Pack of the tender document and it will be updated in Part II of the Tender Document)
¸½¼þ C – ÑùÆ·¼Æ»®£¨Çë²ÎÔÄÕбêÎļþÖеijÉÌ×Ê©¹¤Í¼Éè¼ÆÎļþ£¬Õâ¸öÎļþ¿ÉÄÜÔÚµÚ¶þ²¿·ÖÕбêÎļþÖÐÐÞÕý¡£)
Appendix D–Soils Report dated 1st August 2007
¸½¼þ D – 2007Äê8ÔÂ1ÈÕµÄÑÒÍÁ¹¤³Ì¿±²ì±¨¸æ
Appendix E–EI Report version 2.0 dated 26th November 2007
¸½¼þ E – 2007Äê11ÔÂ26ÈյĻ·¾³Ñо¿±¨¸æµÚ¶þ°æ
Appendix F–Design and Build Suggestions resulting from the *** Global Ltd’s Phase I and Phase II Environmental Investigations of the site dated 30th November 2007
¸½¼þ F – ¸ù¾Ý***»·¾³¹¤³Ì£¨ÉϺ££©ÓÐÏÞ¹«Ë¾Õë¶Ô³¡µØÏÖ³¡µÄµÚÒ»½×¶ÎºÍµÚ¶þ½×¶Î»·¾³Ñо¿µÄ³É¹ûµÄ·¢²¼ÓÚ2007Äê11ÔÂ30ÈյĶÔÉè¼ÆºÍ½¨ÉèµÄ½¨Òé·½°¸